Only the right has signed this so far (Bill Ranking)
H.R. 1047 · 119th Congress (2025-2026)
18 members · Left 0 · Center 1 · Right 17 (Bill Ranking)
| Sponsor | Rep. Balderson, Troy (R-OH) (Introduced 02/06/2025) |
|---|---|
| Sponsor Voting Record | Lean right · DW-NOMINATE +0.46 · measured from every roll-call vote this member has cast (voteview.com) (Sponsor Ranking) |
| Support |
LLLCLRR support across the spectrum: 18 members signed on (Bill Ranking) this bill: sponsor + current cosponsors, each once |
| Committees | Senate - Energy and Natural Resources Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee |
| Latest Action | 09/19/2025 Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources. |
| Roll Call Votes | 1 |
| Source | view on congress.gov → |
Introduced in House (02/06/2025)
Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act
This bill requires the Federal Energy Regulatory Commission (FERC) to issue and periodically review a rule that revises the approval process for interconnection requests of generating units that produce electricity to prioritize dispatchable power projects (e.g., certain fossil fuel projects).
Under the bill, dispatchable power generally refers to an electric energy generation resource, such as a generating unit that produces electricity from fossil fuels, capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. Currently, FERC receives interconnection requests from those projects and other generating units, such as units that produce electricity from renewable energy. Interconnection requests are requests from generating units to connect to the high voltage transmission lines of the electric grid.
First, the rule must address the efficiency and effectiveness of the existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably.
Second, the rule must revise the pro forma Large Generator Interconnection Procedures, and the pro forma Large Generator Interconnection Agreement as appropriate, to authorize transmission providers to submit proposals to FERC to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue of the provider. FERC must review and approve or deny such proposals within 60 days after the proposal is submitted.
119 HR 1047 EH: Guaranteeing Reliability through the Interconnection of Dispatchable Power Act U.S. House of Representatives text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. I 119th CONGRESS 1st Session H. R. 1047
IN THE HOUSE OF REPRESENTATIVES AN ACT To require the Federal Energy Regulatory Commission to reform the interconnection queue process for the prioritization and approval of certain projects, and for other purposes.
1.Short titleThis Act may be cited as the Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act.
2.DefinitionsIn this Act: (1)Bulk-power systemThe term bulk-power system has the meaning given the term in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)). (2)CommissionThe term Commission means the Federal Energy Regulatory Commission. (3)Dispatchable powerThe term dispatchable power means an electric energy generation resource capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. (4)Grid reliabilityThe term grid reliability means the ability of the electric grid to deliver an adequate, secure, and stable flow of electricity in the quantity and with the quality demanded by users, taking into account the ability of the bulk-power system to withstand sudden disturbances. (5)Grid resilienceThe term grid resilience means the ability of the electric grid to adapt to changing physical conditions and withstand and rapidly recover from significant disturbances, including natural disasters, cyber-attacks, and other unforeseen events. (6)Independent System OperatorThe term Independent System Operator has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796). (7)Regional Transmission OrganizationThe term Regional Transmission Organization has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796). (8)Resource adequacyThe term resource adequacy means the ability of the electric system to meet the aggregate electrical demand and energy requirements of end-use customers at all times, accounting for scheduled and reasonably expected unscheduled outages of bulk-power system components. (9)Transmission providerThe term transmission provider means— (A)a public utility (as defined in section 201(e) of the Federal Power Act (16 U.S.C. 824(e))) that owns, operates, or controls 1 or more transmission facilities; (B)an Independent System Operator; and (C)a Regional Transmission Organization.
3.Rulemaking to improve interconnection queue flexibility (a)In generalNot later than 90 days after the date of enactment of this Act, the Commission shall initiate a rulemaking— (1)to address the inefficiencies and ineffectiveness of existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably; and (2)to amend the pro forma Large Generator Interconnection Procedures and, as appropriate, the pro forma Large Generator Interconnection Agreement, promulgated pursuant to section 35.28(f) of title 18, Code of Federal Regulations (or successor regulations)— (A)to authorize transmission providers to submit proposals to the Commission to adjust the interconnection queue of the transmission provider to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue; and (B)to require transmission providers— (i)to provide in any proposal described in subparagraph (A)— (I)a demonstration of need for prioritization of the relevant projects; and (II)a description of how the prioritization of those projects will improve grid reliability or grid resilience; (ii)to provide a process for public comment and stakeholder engagement before a proposal described in subparagraph (A) is submitted to the Commission; and (iii)to provide regular reporting to the Commission on the state of grid reliability and grid resilience, including reporting on any actions taken pursuant to this Act. (b)Commission approvalTo ensure timely responses to grid reliability concerns, not later than 60 days after a proposal is submitted pursuant to subsection (a)(2), the Commission shall— (1)review the proposal; and (2)approve or deny the proposal. (c)Deadline for final ruleNot later than 180 days after the date of enactment of this Act, the Commission shall promulgate final regulations to complete the rulemaking initiated under subsection (a). (d)Periodic reviewNot less frequently than once every 5 years, the Commission shall review and, if necessary, update the regulations promulgated under this section to ensure that those regulations remain effective and relevant to evolving grid reliability and grid resilience challenges. Passed the House of Representatives September 18, 2025.Kevin F. McCumber,Clerk.
119 HR 1047 IH: Guaranteeing Reliability through the Interconnection of Dispatchable Power Act U.S. House of Representatives 2025-02-06 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. I119th CONGRESS1st SessionH. R. 1047IN THE HOUSE OF REPRESENTATIVESFebruary 6, 2025Mr. Balderson introduced the following bill; which was referred to the Committee on Energy and CommerceA BILLTo require the Federal Energy Regulatory Commission to reform the interconnection queue process for the prioritization and approval of certain projects, and for other purposes.
1.Short titleThis Act may be cited as the Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act.
2.DefinitionsIn this Act: (1)Bulk-power systemThe term bulk-power system has the meaning given the term in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)). (2)CommissionThe term Commission means the Federal Energy Regulatory Commission. (3)Dispatchable powerThe term dispatchable power means an electric energy generation resource capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. (4)Grid reliabilityThe term grid reliability means the ability of the electric grid to deliver an adequate, secure, and stable flow of electricity in the quantity and with the quality demanded by users, taking into account the ability of the bulk-power system to withstand sudden disturbances. (5)Grid resilienceThe term grid resilience means the ability of the electric grid to adapt to changing physical conditions and withstand and rapidly recover from significant disturbances, including natural disasters, cyber-attacks, and other unforeseen events. (6)Independent System OperatorThe term Independent System Operator has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796). (7)Regional Transmission OrganizationThe term Regional Transmission Organization has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796). (8)Resource adequacyThe term resource adequacy means the ability of the electric system to meet the aggregate electrical demand and energy requirements of end-use customers at all times, accounting for scheduled and reasonably expected unscheduled outages of bulk-power system components. (9)Transmission providerThe term transmission provider means— (A)a public utility (as defined in section 201(e) of the Federal Power Act (16 U.S.C. 824(e))) that owns, operates, or controls 1 or more transmission facilities; (B)an Independent System Operator; and (C)a Regional Transmission Organization.
3.Rulemaking to improve interconnection queue flexibility (a)In generalNot later than 90 days after the date of enactment of this Act, the Commission shall initiate a rulemaking— (1)to address the inefficiencies and ineffectiveness of existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably; and (2)to amend the pro forma Large Generator Interconnection Procedures and, as appropriate, the pro forma Large Generator Interconnection Agreement, promulgated pursuant to section 35.28(f) of title 18, Code of Federal Regulations (or successor regulations)— (A)to authorize transmission providers to submit proposals to the Commission to adjust the interconnection queue of the transmission provider to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue; and (B)to require transmission providers— (i)to provide in any proposal described in subparagraph (A)— (I)a demonstration of need for prioritization of the relevant projects; and (II)a description of how the prioritization of those projects will improve grid reliability or grid resilience; (ii)to provide a process for public comment and stakeholder engagement before a proposal described in subparagraph (A) is submitted to the Commission; and (iii)to provide regular reporting to the Commission on the state of grid reliability and grid resilience, including reporting on any actions taken pursuant to this Act. (b)Commission approvalTo ensure timely responses to grid reliability concerns, not later than 60 days after a proposal is submitted pursuant to subsection (a)(2), the Commission shall— (1)review the proposal; and (2)approve or deny the proposal. (c)Deadline for final ruleNot later than 180 days after the date of enactment of this Act, the Commission shall promulgate final regulations to complete the rulemaking initiated under subsection (a). (d)Periodic reviewNot less frequently than once every 5 years, the Commission shall review and, if necessary, update the regulations promulgated under this section to ensure that those regulations remain effective and relevant to evolving grid reliability and grid resilience challenges.
119 HR 1047 : Guaranteeing Reliability through the Interconnection of Dispatchable Power Act U.S. House of Representatives 2025-09-19 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IIB119th CONGRESS1st SessionH. R. 1047IN THE SENATE OF THE UNITED STATESSeptember 19 (legislative day, September 16), 2025Received; read twice and referred to the Committee on Energy and Natural ResourcesAN ACTTo require the Federal Energy Regulatory Commission to reform the interconnection queue process for the prioritization and approval of certain projects, and for other purposes.1.Short titleThis Act may be cited as the Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act.
2.DefinitionsIn this Act:(1)Bulk-power systemThe term bulk-power system has the meaning given the term in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)).(2)CommissionThe term Commission means the Federal Energy Regulatory Commission.(3)Dispatchable powerThe term dispatchable power means an electric energy generation resource capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. (4)Grid reliabilityThe term grid reliability means the ability of the electric grid to deliver an adequate, secure, and stable flow of electricity in the quantity and with the quality demanded by users, taking into account the ability of the bulk-power system to withstand sudden disturbances.(5)Grid resilienceThe term grid resilience means the ability of the electric grid to adapt to changing physical conditions and withstand and rapidly recover from significant disturbances, including natural disasters, cyber-attacks, and other unforeseen events.(6)Independent System OperatorThe term Independent System Operator has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796). (7)Regional Transmission OrganizationThe term Regional Transmission Organization has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796). (8)Resource adequacyThe term resource adequacy means the ability of the electric system to meet the aggregate electrical demand and energy requirements of end-use customers at all times, accounting for scheduled and reasonably expected unscheduled outages of bulk-power system components. (9)Transmission providerThe term transmission provider means—(A)a public utility (as defined in section 201(e) of the Federal Power Act (16 U.S.C. 824(e))) that owns, operates, or controls 1 or more transmission facilities;(B)an Independent System Operator; and(C)a Regional Transmission Organization.3.Rulemaking to improve interconnection queue flexibility(a)In generalNot later than 90 days after the date of enactment of this Act, the Commission shall initiate a rulemaking—(1)to address the inefficiencies and ineffectiveness of existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably; and(2)to amend the pro forma Large Generator Interconnection Procedures and, as appropriate, the pro forma Large Generator Interconnection Agreement, promulgated pursuant to section 35.28(f) of title 18, Code of Federal Regulations (or successor regulations)—(A)to authorize transmission providers to submit proposals to the Commission to adjust the interconnection queue of the transmission provider to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue; and(B)to require transmission providers—(i)to provide in any proposal described in subparagraph (A)—(I)a demonstration of need for prioritization of the relevant projects; and(II)a description of how the prioritization of those projects will improve grid reliability or grid resilience;(ii)to provide a process for public comment and stakeholder engagement before a proposal described in subparagraph (A) is submitted to the Commission; and(iii)to provide regular reporting to the Commission on the state of grid reliability and grid resilience, including reporting on any actions taken pursuant to this Act.(b)Commission approvalTo ensure timely responses to grid reliability concerns, not later than 60 days after a proposal is submitted pursuant to subsection (a)(2), the Commission shall—(1)review the proposal; and(2)approve or deny the proposal.(c)Deadline for final ruleNot later than 180 days after the date of enactment of this Act, the Commission shall promulgate final regulations to complete the rulemaking initiated under subsection (a).(d)Periodic reviewNot less frequently than once every 5 years, the Commission shall review and, if necessary, update the regulations promulgated under this section to ensure that those regulations remain effective and relevant to evolving grid reliability and grid resilience challenges.Passed the House of Representatives September 18, 2025.Kevin F. McCumber,Clerk.
119 HR 1047 RH: Guaranteeing Reliability through the Interconnection of Dispatchable Power Act U.S. House of Representatives 2025-09-15 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IBUnion Calendar No. 251119th CONGRESS1st SessionH. R. 1047[Report No. 119–295]IN THE HOUSE OF REPRESENTATIVESFebruary 6, 2025Mr. Balderson introduced the following bill; which was referred to the Committee on Energy and CommerceSeptember 15, 2025Additional sponsors: Ms. Fedorchak, Mr. Weber of Texas, Mr. Yakym, Mr. Langworthy, Mrs. Miller of West Virginia, Mrs. Harshbarger, Mr. Dunn of Florida, Mr. Joyce of Pennsylvania, Mr. Rulli, Mr. Bilirakis, Mr. Bresnahan, Mr. Griffith, Mr. Hudson, Mr. Lawler, Mr. Mann, Mr. Onder, and Mr. WittmanSeptember 15, 2025Committed to the Committee of the Whole House on the State of the Union and ordered to be printedA BILLTo require the Federal Energy Regulatory Commission to reform the interconnection queue process for the prioritization and approval of certain projects, and for other purposes.1.Short titleThis Act may be cited as the Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power Act.
2.DefinitionsIn this Act:(1)Bulk-power systemThe term bulk-power system has the meaning given the term in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a)).(2)CommissionThe term Commission means the Federal Energy Regulatory Commission.(3)Dispatchable powerThe term dispatchable power means an electric energy generation resource capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. (4)Grid reliabilityThe term grid reliability means the ability of the electric grid to deliver an adequate, secure, and stable flow of electricity in the quantity and with the quality demanded by users, taking into account the ability of the bulk-power system to withstand sudden disturbances.(5)Grid resilienceThe term grid resilience means the ability of the electric grid to adapt to changing physical conditions and withstand and rapidly recover from significant disturbances, including natural disasters, cyber-attacks, and other unforeseen events.(6)Independent System OperatorThe term Independent System Operator has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796). (7)Regional Transmission OrganizationThe term Regional Transmission Organization has the meaning given the term in section 3 of the Federal Power Act (16 U.S.C. 796). (8)Resource adequacyThe term resource adequacy means the ability of the electric system to meet the aggregate electrical demand and energy requirements of end-use customers at all times, accounting for scheduled and reasonably expected unscheduled outages of bulk-power system components. (9)Transmission providerThe term transmission provider means—(A)a public utility (as defined in section 201(e) of the Federal Power Act (16 U.S.C. 824(e))) that owns, operates, or controls 1 or more transmission facilities;(B)an Independent System Operator; and(C)a Regional Transmission Organization.3.Rulemaking to improve interconnection queue flexibility(a)In generalNot later than 90 days after the date of enactment of this Act, the Commission shall initiate a rulemaking—(1)to address the inefficiencies and ineffectiveness of existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably; and(2)to amend the pro forma Large Generator Interconnection Procedures and, as appropriate, the pro forma Large Generator Interconnection Agreement, promulgated pursuant to section 35.28(f) of title 18, Code of Federal Regulations (or successor regulations)—(A)to authorize transmission providers to submit proposals to the Commission to adjust the interconnection queue of the transmission provider to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue; and(B)to require transmission providers—(i)to provide in any proposal described in subparagraph (A)—(I)a demonstration of need for prioritization of the relevant projects; and(II)a description of how the prioritization of those projects will improve grid reliability or grid resilience;(ii)to provide a process for public comment and stakeholder engagement before a proposal described in subparagraph (A) is submitted to the Commission; and(iii)to provide regular reporting to the Commission on the state of grid reliability and grid resilience, including reporting on any actions taken pursuant to this Act.(b)Commission approvalTo ensure timely responses to grid reliability concerns, not later than 60 days after a proposal is submitted pursuant to subsection (a)(2), the Commission shall—(1)review the proposal; and(2)approve or deny the proposal.(c)Deadline for final ruleNot later than 180 days after the date of enactment of this Act, the Commission shall promulgate final regulations to complete the rulemaking initiated under subsection (a).(d)Periodic reviewNot less frequently than once every 5 years, the Commission shall review and, if necessary, update the regulations promulgated under this section to ensure that those regulations remain effective and relevant to evolving grid reliability and grid resilience challenges.September 15, 2025Committed to the Committee of the Whole House on the State of the Union and ordered to be printed
The bill's own words, from our database (synced from the GPO BILLS XML); paragraph breaks added at the bill's section boundaries, nothing else changed.
| Date | Chamber | All Actions |
|---|---|---|
| 02/06/2025 | Library of Congress | Introduced in House |
| 02/06/2025 | Library of Congress | Introduced in House |
| 02/06/2025 | House floor actions | Referred to the House Committee on Energy and Commerce. |
| 06/03/2025 | House committee actions | Referred to the Subcommittee on Energy. |
| 06/05/2025 | House committee actions | Subcommittee Consideration and Mark-up Session Held |
| 06/05/2025 | House committee actions | Forwarded by Subcommittee to Full Committee by the Yeas and Nays: 16 - 14. |
| 06/25/2025 | House committee actions | Committee Consideration and Mark-up Session Held |
| 06/25/2025 | House committee actions | Ordered to be Reported by the Yeas and Nays: 28 - 23. |
| 09/15/2025 | Library of Congress | Reported by the Committee on Energy and Commerce. H. Rept. 119-295. |
| 09/15/2025 | House floor actions | Reported by the Committee on Energy and Commerce. H. Rept. 119-295. |
| 09/15/2025 | House floor actions | Placed on the Union Calendar, Calendar No. 251. |
| 09/15/2025 | House floor actions | Rules Committee Resolution H. Res. 707 Reported to House. Rule provides for consideration of H.R. 4922, H.R. 5143, H.R. 5140, H.R. 5125, H.R. 1047, H.R. 3015 and H.R. 3062. The resolution provides for consideration of H.R. 4922, H.R. 5143, H.R. 5140, H.R. 5125, H.R. 1047, H.R. 3015, and H.R. 3062 under a closed rule, and provides for a motion to recommit on each measure. |
| 09/18/2025 | House floor actions | Considered under the provisions of rule H. Res. 707. (consideration: CR H4433) |
| 09/18/2025 | House floor actions | Rule provides for consideration of H.R. 4922, H.R. 5143, H.R. 5140, H.R. 5125, H.R. 1047, H.R. 3015 and H.R. 3062. The resolution provides for consideration of H.R. 4922, H.R. 5143, H.R. 5140, H.R. 5125, H.R. 1047, H.R. 3015, and H.R. 3062 under a closed rule, and provides for a motion to recommit on each measure. |
| 09/18/2025 | House floor actions | DEBATE - The House proceeded with one hour of debate on H.R. 1047. |
| 09/18/2025 | House floor actions | The previous question was ordered pursuant to the rule. |
| 09/18/2025 | House floor actions | POSTPONED PROCEEDINGS - At the conclusion of debate on H.R. 1047, the Chair put the question on passage of the bill, and by voice vote, announced that the ayes had prevailed. Mr. Pallone demanded the yeas and nays and the Chair postponed further proceedings until a time to be announced. |
| 09/18/2025 | House floor actions | Considered as unfinished business. (consideration: CR H4444) |
| 09/18/2025 | Library of Congress | Passed/agreed to in House: On passage Passed by the Yeas and Nays: 216 - 206 (Roll no. 279). (text of amendment in the nature of a substitute: CR H4433-4434: 1) |
| 09/18/2025 | House floor actions | On passage Passed by the Yeas and Nays: 216 - 206 (Roll no. 279). (text of amendment in the nature of a substitute: CR H4433) |
| 09/18/2025 | House floor actions | Motion to reconsider laid on the table Agreed to without objection. |
| 09/19/2025 | Senate | Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources. |
| Title Type | Title |
|---|---|
| Display Title | GRID Power Act |
| Short Titles from RFS (Referred to Senate) bill text | GRID Power Act |
| Short Titles from RFS (Referred to Senate) bill text | Guaranteeing Reliability through the Interconnection of Dispatchable Power Act |
| Short Title(s) as Passed House | Guaranteeing Reliability through the Interconnection of Dispatchable Power Act |
| Official Titles from EH (Engrossed in House) bill text | To require the Federal Energy Regulatory Commission to reform the interconnection queue process for the prioritization and approval of certain projects, and for other purposes. |
| Short Title(s) as Passed House | GRID Power Act |
| Short Title(s) as Reported to House | GRID Power Act |
| Short Title(s) as Reported to House | Guaranteeing Reliability through the Interconnection of Dispatchable Power Act |
| Short Title(s) as Introduced | Guaranteeing Reliability through the Interconnection of Dispatchable Power Act |
| Short Title(s) as Introduced | GRID Power Act |
| Official Title as Introduced | To require the Federal Energy Regulatory Commission to reform the interconnection queue process for the prioritization and approval of certain projects, and for other purposes. |
| Amendment | Sponsor | Purpose | Latest Action |
|---|---|---|---|
| HAMDT 108 | 09/18/2025 On agreeing to the Rules amendment (A001) Agreed to without objection. |
* = Original cosponsor
| Committee | Activity |
|---|---|
| Senate - Energy and Natural Resources Committee | 09/19/2025 Referred To |
| House - Energy and Commerce Committee | 09/15/2025 Reported By |
| House - Energy and Commerce Committee | 06/25/2025 Markup By |
| House - Energy and Commerce Committee | 02/06/2025 Referred To |
Policy Area: Energy
All data on this page comes from our own database (legislation.congress_* tables), synced daily from the GPO govinfo BILLSTATUS and BILLS collections. Formatted after congress.gov; nothing is generated. Member placement is their DW-NOMINATE score (voteview.com, Lewis et al.) - a measurement of roll-call voting behavior, not our judgement. Buckets: Left below −0.50 · Lean Left to −0.25 · Center to +0.25 · Lean Right to +0.50 · Right above +0.50. The bill's Support meter aggregates the people who signed the bill - sponsor and current cosponsors, each counted once - nothing else.