Only the right has signed this so far (Bill Ranking)
H.R. 3638 · 119th Congress (2025-2026)
3 members · Left 0 · Center 0 · Right 3 (Bill Ranking)
| Sponsor | Rep. Latta, Robert E. (R-OH) (Introduced 05/29/2025) |
|---|---|
| Sponsor Voting Record | Right · DW-NOMINATE +0.51 · measured from every roll-call vote this member has cast (voteview.com) (Sponsor Ranking) |
| Support |
LLLCLRR support across the spectrum: 3 members signed on (Bill Ranking) this bill: sponsor + current cosponsors, each once |
| Committees | Senate - Energy and Natural Resources Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee |
| Latest Action | 12/15/2025 Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources. |
| Roll Call Votes | 1 |
| Source | view on congress.gov → |
Reported to House (09/19/2025)
Electric Supply Chain Act
This bill requires the Department of Energy (DOE) to periodically assess the supply chain that supports the generation and transmission of electricity and report on the assessment to the appropriate congressional committees.
Specifically, DOE must periodically assess and report on
The initial report must be submitted no later than one year after the date of enactment of this bill.
119 HR 3638 EH: Electric Supply Chain Act U.S. House of Representatives text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IB 119th CONGRESS1st Session H. R. 3638
IN THE HOUSE OF REPRESENTATIVES AN ACT To direct the Secretary of Energy to prepare periodic assessments and submit reports on the supply chain for the generation and transmission of electricity, and for other purposes.
1.Short titleThis Act may be cited as the Electric Supply Chain Act.
2.Assessment and report on the supply chain for the generation and transmission of electricity (a)AssessmentIn carrying out the requirements of the Department of Energy Organization Act (42 U.S.C. 7101 et seq.), the Secretary shall, for purposes of monitoring the supply chain for the generation and transmission of electricity and in consultation with relevant stakeholders, prepare periodic assessments on such supply chain that— (1)include information on— (A)efforts and opportunities to strengthen, secure, and expand such supply chain, including with respect to overcoming obstacles to broader deployment of advanced transmission technologies, including advanced conductors and other technologies that can be installed to increase the transfer capacity, efficiency, affordability, reliability, or resiliency of transmission infrastructure; (B)any trends, risks, and vulnerabilities in the supply, demand, and availability of components for or related to generating or transmitting electricity, including components that are necessary for the construction or deployment of facilities that generate or transmit electricity or can support advanced transmission technologies, including advanced conductors and other technologies that can be installed to increase the transfer capacity, efficiency, affordability, reliability, or resiliency of transmission infrastructure; (C)national security and energy security considerations for strengthening, securing, and expanding such supply chain, including efforts of any foreign entity of concern to exploit supply chain disruptions for the purposes of undermining United States leadership in artificial intelligence development; (D)barriers to expanding the capacity to— (i)manufacture, deliver, and install components for or related to generating or transmitting electricity in the United States; and (ii)process critical materials in the United States; (E)domestic policies that deter or otherwise inhibit greater investment into such supply chain; (F)the effects of any reliance of the United States on any foreign entity of concern for— (i)components for or related to generating or transmitting electricity; and (ii)the exploration, development, or production of critical materials necessary for manufacturing such components; (G)workforce challenges affecting such supply chain; (H)any vulnerabilities from the employment of any non-United States citizen at a facility located in the United States that generates or transmits electricity; and (I)opportunities to expand participation in the workforce supporting such supply chain by veterans, transitioning servicemembers, and military spouses, including any barriers to entry in such workforce and opportunities for enhanced Federal coordination; (2)identify emerging issues in such supply chain; and (3)include recommendations to— (A)address any emerging issues identified under paragraph (2); and (B)secure and expand such supply chain. (b)ReportNot later than one year after the date of enactment of this Act, and periodically thereafter, the Secretary shall submit to the appropriate committees of Congress a report on the most recent assessment prepared under subsection (a). (c)DefinitionsIn this section: (1)Appropriate committees of CongressThe term appropriate committees of Congress means— (A)the Committee on Energy and Commerce of the House of Representatives; and (B)the Committee on Energy and Natural Resources of the Senate. (2)Critical materialThe term critical material has the meaning given such term in section 7002(a) of the Energy Act of 2020 (30 U.S.C. 1606(a)). (3)Electric Reliability OrganizationThe term Electric Reliability Organization has the meaning given such term in section 215(a) of the Federal Power Act (42 U.S.C. 824o(a)). (4)Electric utilityThe term electric utility has the meaning given such term in section 3 of the Federal Power Act (16 U.S.C. 796). (5)Foreign entity of concernThe term foreign entity of concern has the meaning given such term in section 40207(a) of the Infrastructure Investment and Jobs Act (42 U.S.C. 18741(a)). (6)Relevant stakeholderThe term relevant stakeholder— (A)means a stakeholder that is involved in— (i)the generation, storage, transmission, or distribution of electricity; or (ii)the supply chain for such generation, storage, transmission, or distribution; and (B)includes an electric utility, an electric grid component manufacturer, a person who constructs an electric generating facility, an electric power system cybersecurity expert, the Electric Reliability Organization, a ratepayer advocacy stakeholder, and any other related private sector stakeholder. (7)SecretaryThe term Secretary means the Secretary of Energy. Passed the House of Representatives December 11, 2025.Kevin F. McCumber,Clerk.
119 HR 3638 IH: Electric Supply Chain Act U.S. House of Representatives 2025-05-29 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. I119th CONGRESS1st SessionH. R. 3638IN THE HOUSE OF REPRESENTATIVESMay 29, 2025Mr. Latta introduced the following bill; which was referred to the Committee on Energy and CommerceA BILLTo direct the Secretary of Energy to prepare periodic assessments and submit reports on the supply chain for the generation and transmission of electricity, and for other purposes.
1.Short titleThis Act may be cited as the Electric Supply Chain Act.
2.Assessment and report on the supply chain for the generation and transmission of electricity (a)AssessmentIn carrying out the requirements of the Department of Energy Organization Act (42 U.S.C. 7101 et seq.), the Secretary shall, for purposes of monitoring the supply chain for the generation and transmission of electricity and in consultation with relevant stakeholders, prepare periodic assessments on such supply chain that— (1)include information on— (A)efforts and opportunities to strengthen, secure, and expand such supply chain; (B)any trends, risks, and vulnerabilities in the supply, demand, and availability of components for or related to generating or transmitting electricity, including components that are necessary for the construction or deployment of facilities that generate or transmit electricity; (C)national security and energy security considerations for strengthening, securing, and expanding such supply chain; (D)barriers to expanding the capacity to— (i)manufacture components for or related to generating or transmitting electricity in the United States; and (ii)process critical materials in the United States; (E)domestic policies that deter or otherwise inhibit greater investment into such supply chain; (F)the effects of any reliance of the United States on any foreign entity of concern for— (i)components for or related to generating or transmitting electricity; and (ii)the exploration, development, or production of critical materials necessary for manufacturing such components; and (G)workforce challenges affecting such supply chain; (2)identify emerging issues in such supply chain; and (3)include recommendations to— (A)address any emerging issues identified under paragraph (2); and (B)secure and expand such supply chain. (b)ReportNot later than one year after the date of enactment of this Act, and periodically thereafter, the Secretary shall submit to the appropriate committees of Congress a report on the most recent assessment prepared under subsection (a). (c)DefinitionsIn this section: (1)Appropriate committees of CongressThe term appropriate committees of Congress means— (A)the Committee on Energy and Commerce of the House of Representatives; and (B)the Committee on Energy and Natural Resources of the Senate. (2)Critical materialThe term critical material has the meaning given such term in section 7002(a) of the Energy Act of 2020 (30 U.S.C. 1606(a)). (3)Electric Reliability OrganizationThe term Electric Reliability Organization has the meaning given such term in section 215(a) of the Federal Power Act (42 U.S.C. 824o(a)). (4)Electric utilityThe term electric utility has the meaning given such term in section 3 of the Federal Power Act (16 U.S.C. 796). (5)Foreign entity of concernThe term foreign entity of concern has the meaning given such term in section 40207(a) of the Infrastructure Investment and Jobs Act (42 U.S.C. 18741(a)). (6)Relevant stakeholderThe term relevant stakeholder— (A)means a stakeholder that is involved in— (i)the generation, storage, transmission, or distribution of electricity; or (ii)the supply chain for such generation, storage, transmission, or distribution; and (B)includes an electric utility, an electric grid component manufacturer, a person who constructs an electric generating facility, an electric power system cybersecurity expert, the Electric Reliability Organization, a ratepayer advocacy stakeholder, and any other related private sector stakeholder. (7)SecretaryThe term Secretary means the Secretary of Energy.
119 HR 3638 : Electric Supply Chain Act U.S. House of Representatives 2025-12-15 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IIB 119th CONGRESS1st Session H. R. 3638
IN THE SENATE OF THE UNITED STATES December 15, 2025 Received; read twice and referred to the Committee on Energy and Natural Resources AN ACT To direct the Secretary of Energy to prepare periodic assessments and submit reports on the supply chain for the generation and transmission of electricity, and for other purposes.
1.Short titleThis Act may be cited as the Electric Supply Chain Act.
2.Assessment and report on the supply chain for the generation and transmission of electricity (a)AssessmentIn carrying out the requirements of the Department of Energy Organization Act (42 U.S.C. 7101 et seq.), the Secretary shall, for purposes of monitoring the supply chain for the generation and transmission of electricity and in consultation with relevant stakeholders, prepare periodic assessments on such supply chain that— (1)include information on— (A)efforts and opportunities to strengthen, secure, and expand such supply chain, including with respect to overcoming obstacles to broader deployment of advanced transmission technologies, including advanced conductors and other technologies that can be installed to increase the transfer capacity, efficiency, affordability, reliability, or resiliency of transmission infrastructure; (B)any trends, risks, and vulnerabilities in the supply, demand, and availability of components for or related to generating or transmitting electricity, including components that are necessary for the construction or deployment of facilities that generate or transmit electricity or can support advanced transmission technologies, including advanced conductors and other technologies that can be installed to increase the transfer capacity, efficiency, affordability, reliability, or resiliency of transmission infrastructure; (C)national security and energy security considerations for strengthening, securing, and expanding such supply chain, including efforts of any foreign entity of concern to exploit supply chain disruptions for the purposes of undermining United States leadership in artificial intelligence development; (D)barriers to expanding the capacity to— (i)manufacture, deliver, and install components for or related to generating or transmitting electricity in the United States; and (ii)process critical materials in the United States; (E)domestic policies that deter or otherwise inhibit greater investment into such supply chain; (F)the effects of any reliance of the United States on any foreign entity of concern for— (i)components for or related to generating or transmitting electricity; and (ii)the exploration, development, or production of critical materials necessary for manufacturing such components; (G)workforce challenges affecting such supply chain; (H)any vulnerabilities from the employment of any non-United States citizen at a facility located in the United States that generates or transmits electricity; and (I)opportunities to expand participation in the workforce supporting such supply chain by veterans, transitioning servicemembers, and military spouses, including any barriers to entry in such workforce and opportunities for enhanced Federal coordination; (2)identify emerging issues in such supply chain; and (3)include recommendations to— (A)address any emerging issues identified under paragraph (2); and (B)secure and expand such supply chain. (b)ReportNot later than one year after the date of enactment of this Act, and periodically thereafter, the Secretary shall submit to the appropriate committees of Congress a report on the most recent assessment prepared under subsection (a). (c)DefinitionsIn this section: (1)Appropriate committees of CongressThe term appropriate committees of Congress means— (A)the Committee on Energy and Commerce of the House of Representatives; and (B)the Committee on Energy and Natural Resources of the Senate. (2)Critical materialThe term critical material has the meaning given such term in section 7002(a) of the Energy Act of 2020 (30 U.S.C. 1606(a)). (3)Electric Reliability OrganizationThe term Electric Reliability Organization has the meaning given such term in section 215(a) of the Federal Power Act (42 U.S.C. 824o(a)). (4)Electric utilityThe term electric utility has the meaning given such term in section 3 of the Federal Power Act (16 U.S.C. 796). (5)Foreign entity of concernThe term foreign entity of concern has the meaning given such term in section 40207(a) of the Infrastructure Investment and Jobs Act (42 U.S.C. 18741(a)). (6)Relevant stakeholderThe term relevant stakeholder— (A)means a stakeholder that is involved in— (i)the generation, storage, transmission, or distribution of electricity; or (ii)the supply chain for such generation, storage, transmission, or distribution; and (B)includes an electric utility, an electric grid component manufacturer, a person who constructs an electric generating facility, an electric power system cybersecurity expert, the Electric Reliability Organization, a ratepayer advocacy stakeholder, and any other related private sector stakeholder. (7)SecretaryThe term Secretary means the Secretary of Energy. Passed the House of Representatives December 11, 2025.Kevin F. McCumber,Clerk.
119 HR 3638 RH: Electric Supply Chain Act U.S. House of Representatives 2025-09-19 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IBUnion Calendar No. 258119th CONGRESS1st SessionH. R. 3638[Report No. 119–304]IN THE HOUSE OF REPRESENTATIVESMay 29, 2025Mr. Latta introduced the following bill; which was referred to the Committee on Energy and CommerceSeptember 19, 2025Additional sponsors: Mr. Dunn of Florida and Mr. WittmanSeptember 19, 2025Committed to the Committee of the Whole House on the State of the Union and ordered to be printedA BILLTo direct the Secretary of Energy to prepare periodic assessments and submit reports on the supply chain for the generation and transmission of electricity, and for other purposes.1.Short titleThis Act may be cited as the Electric Supply Chain Act.2.Assessment and report on the supply chain for the generation and transmission of electricity(a)AssessmentIn carrying out the requirements of the Department of Energy Organization Act (42 U.S.C. 7101 et seq.), the Secretary shall, for purposes of monitoring the supply chain for the generation and transmission of electricity and in consultation with relevant stakeholders, prepare periodic assessments on such supply chain that—(1)include information on—(A)efforts and opportunities to strengthen, secure, and expand such supply chain;(B)any trends, risks, and vulnerabilities in the supply, demand, and availability of components for or related to generating or transmitting electricity, including components that are necessary for the construction or deployment of facilities that generate or transmit electricity;(C)national security and energy security considerations for strengthening, securing, and expanding such supply chain;(D)barriers to expanding the capacity to—(i)manufacture components for or related to generating or transmitting electricity in the United States; and(ii)process critical materials in the United States;(E)domestic policies that deter or otherwise inhibit greater investment into such supply chain;(F)the effects of any reliance of the United States on any foreign entity of concern for—(i)components for or related to generating or transmitting electricity; and(ii)the exploration, development, or production of critical materials necessary for manufacturing such components; and(G)workforce challenges affecting such supply chain;(2)identify emerging issues in such supply chain; and(3)include recommendations to—(A)address any emerging issues identified under paragraph (2); and(B)secure and expand such supply chain.(b)ReportNot later than one year after the date of enactment of this Act, and periodically thereafter, the Secretary shall submit to the appropriate committees of Congress a report on the most recent assessment prepared under subsection (a).(c)DefinitionsIn this section:(1)Appropriate committees of CongressThe term appropriate committees of Congress means—(A)the Committee on Energy and Commerce of the House of Representatives; and(B)the Committee on Energy and Natural Resources of the Senate.(2)Critical materialThe term critical material has the meaning given such term in section 7002(a) of the Energy Act of 2020 (30 U.S.C. 1606(a)).(3)Electric Reliability OrganizationThe term Electric Reliability Organization has the meaning given such term in section 215(a) of the Federal Power Act (42 U.S.C. 824o(a)).(4)Electric utilityThe term electric utility has the meaning given such term in section 3 of the Federal Power Act (16 U.S.C. 796).(5)Foreign entity of concernThe term foreign entity of concern has the meaning given such term in section 40207(a) of the Infrastructure Investment and Jobs Act (42 U.S.C. 18741(a)).(6)Relevant stakeholderThe term relevant stakeholder—(A)means a stakeholder that is involved in—(i)the generation, storage, transmission, or distribution of electricity; or(ii)the supply chain for such generation, storage, transmission, or distribution; and(B)includes an electric utility, an electric grid component manufacturer, a person who constructs an electric generating facility, an electric power system cybersecurity expert, the Electric Reliability Organization, a ratepayer advocacy stakeholder, and any other related private sector stakeholder.(7)SecretaryThe term Secretary means the Secretary of Energy.September 19, 2025Committed to the Committee of the Whole House on the State of the Union and ordered to be printed
The bill's own words, from our database (synced from the GPO BILLS XML); paragraph breaks added at the bill's section boundaries, nothing else changed.
| Date | Chamber | All Actions |
|---|---|---|
| 05/29/2025 | Library of Congress | Introduced in House |
| 05/29/2025 | Library of Congress | Introduced in House |
| 05/29/2025 | House floor actions | Referred to the House Committee on Energy and Commerce. |
| 06/03/2025 | House committee actions | Referred to the Subcommittee on Energy. |
| 06/05/2025 | House committee actions | Subcommittee Consideration and Mark-up Session Held |
| 06/05/2025 | House committee actions | Forwarded by Subcommittee to Full Committee by Voice Vote. |
| 06/25/2025 | House committee actions | Committee Consideration and Mark-up Session Held |
| 06/25/2025 | House committee actions | Ordered to be Reported by the Yeas and Nays: 33 - 16. |
| 09/19/2025 | Library of Congress | Reported by the Committee on Energy and Commerce. H. Rept. 119-304. |
| 09/19/2025 | House floor actions | Reported by the Committee on Energy and Commerce. H. Rept. 119-304. |
| 09/19/2025 | House floor actions | Placed on the Union Calendar, Calendar No. 258. |
| 11/25/2025 | Library of Congress | Supplemental report filed by the Committee on Energy and Commerce, H. Rept. 119-304, Part II. |
| 11/25/2025 | House floor actions | Supplemental report filed by the Committee on Energy and Commerce, H. Rept. 119-304, Part II. |
| 12/09/2025 | House floor actions | Rules Committee Resolution H. Res. 936 Reported to House. Rule provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, H.R. 3668 and S. 1071. The resolution provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, and H.R. 3628 under a structured rule; and H.R. 3668 and S. 1071 under a closed rule. The resolution provides for one motion to recommit on H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, and H.R. 3668; and one motion to commit on S. 1071. |
| 12/10/2025 | House floor actions | Considered under the provisions of rule H. Res. 936. (consideration: CR H5528; text: CR H5531) |
| 12/10/2025 | House floor actions | Rule provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, H.R. 3668 and S. 1071. The resolution provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, and H.R. 3628 under a structured rule; and H.R. 3668 and S. 1071 under a closed rule. The resolution provides for one motion to recommit on H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, and H.R. 3668; and one motion to commit on S. 1071. |
| 12/10/2025 | House floor actions | House resolved itself into the Committee of the Whole House on the state of the Union pursuant to H. Res. 936 and Rule XVIII. |
| 12/10/2025 | House floor actions | The Speaker designated the Honorable James C. Moylan to act as Chairman of the Committee. |
| 12/10/2025 | House floor actions | GENERAL DEBATE - The Committee of the Whole proceeded with one hour of general debate on H.R. 3638. |
| 12/10/2025 | House floor actions | DEBATE - Pursuant to the provisions of H.Res. 936, the Committee of the Whole proceeded with 10 minutes of debate on the Gosar amendment No. 1. |
| 12/10/2025 | House floor actions | DEBATE - Pursuant to the provisions of H.Res. 936, the Committee of the Whole proceeded with 10 minutes of debate on the Min amendment No. 2. |
| 12/10/2025 | House floor actions | DEBATE - Pursuant to the provisions of H.Res. 936, the Committee of the Whole proceeded with 10 minutes of debate on the McGuire amendment No. 3. |
| 12/10/2025 | House floor actions | DEBATE - Pursuant to the provisions of H.Res. 936, the Committee of the Whole proceeded with 10 minutes of debate on the Min amendment No. 4. |
| 12/10/2025 | House floor actions | DEBATE - Pursuant to the provisions of H.Res. 936, the Committee of the Whole proceeded with 10 minutes of debate on the Self amendment No. 5. |
| 12/10/2025 | House floor actions | The House rose from the Committee of the Whole House on the state of the Union to report H.R. 3638. |
| 12/10/2025 | House floor actions | The previous question was ordered pursuant to the rule. |
| 12/10/2025 | House floor actions | The House adopted the amendments en gros as agreed to by the Committee of the Whole House on the state of the Union. |
| 12/10/2025 | House floor actions | POSTPONED PROCEEDINGS - At the conclusion of debate on H.R. 3638, the Chair put the question on passage of the bill and by voice vote announced the ayes had prevailed. Mr. Pallone demanded the yeas and nays and the Chair postponed further proceedings until a time to be announced. |
| 12/11/2025 | House floor actions | Considered as unfinished business. (consideration: CR H5789-5790) |
| 12/11/2025 | Library of Congress | Passed/agreed to in House: On passage Passed by the Yeas and Nays: 267 - 159 (Roll no. 324). |
| 12/11/2025 | House floor actions | On passage Passed by the Yeas and Nays: 267 - 159 (Roll no. 324). |
| 12/11/2025 | House floor actions | Motion to reconsider laid on the table Agreed to without objection. |
| 12/15/2025 | Senate | Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources. |
| Title Type | Title |
|---|---|
| Short Titles from RFS (Referred to Senate) bill text | Electric Supply Chain Act |
| Short Title(s) as Passed House | Electric Supply Chain Act |
| Official Titles from EH (Engrossed in House) bill text | To direct the Secretary of Energy to prepare periodic assessments and submit reports on the supply chain for the generation and transmission of electricity, and for other purposes. |
| Short Title(s) as Reported to House | Electric Supply Chain Act |
| Display Title | Electric Supply Chain Act |
| Short Title(s) as Introduced | Electric Supply Chain Act |
| Official Title as Introduced | To direct the Secretary of Energy to prepare periodic assessments and submit reports on the supply chain for the generation and transmission of electricity, and for other purposes. |
| Amendment | Sponsor | Purpose | Latest Action |
|---|---|---|---|
| HAMDT 118 | Rep. Gosar, Paul A. [R-AZ-9] | 12/10/2025 On agreeing to the Gosar amendment (A001) Agreed to by voice vote. | |
| HAMDT 119 | Rep. Min, Dave [D-CA-47] | 12/10/2025 On agreeing to the Min amendment (A002) Agreed to by voice vote. | |
| HAMDT 120 | Rep. McGuire, John J. [R-VA-5] | 12/10/2025 On agreeing to the McGuire amendment (A003) Agreed to by voice vote. | |
| HAMDT 121 | Rep. Min, Dave [D-CA-47] | 12/10/2025 On agreeing to the Min amendment (A004) Agreed to by voice vote. | |
| HAMDT 122 | Rep. Self, Keith [R-TX-3] | 12/10/2025 On agreeing to the Self amendment (A005) Agreed to by voice vote. |
* = Original cosponsor
| Committee | Activity |
|---|---|
| Senate - Energy and Natural Resources Committee | 12/15/2025 Referred To |
| House - Energy and Commerce Committee | 11/25/2025 Reported By |
| House - Energy and Commerce Committee | 09/19/2025 Reported By |
| House - Energy and Commerce Committee | 06/25/2025 Markup By |
| House - Energy and Commerce Committee | 05/29/2025 Referred To |
Policy Area: Energy
All data on this page comes from our own database (legislation.congress_* tables), synced daily from the GPO govinfo BILLSTATUS and BILLS collections. Formatted after congress.gov; nothing is generated. Member placement is their DW-NOMINATE score (voteview.com, Lewis et al.) - a measurement of roll-call voting behavior, not our judgement. Buckets: Left below −0.50 · Lean Left to −0.25 · Center to +0.25 · Lean Right to +0.50 · Right above +0.50. The bill's Support meter aggregates the people who signed the bill - sponsor and current cosponsors, each counted once - nothing else.