Congressional Legislation · bill 119hr3657 · built from our database

Both sides have signed this (Bill Ranking)

Hydropower Licensing Transparency Act

H.R. 3657 · 119th Congress (2025-2026)

H.R. 3657119TH CONGRESSINTRODUCED 05/29/2025REP. SCHRIERD-WA · SPONSORLeft: no (Sponsor Ranking)Lean left: DW-NOMINATE -0.28 (Sponsor Ranking)Center: no (Sponsor Ranking)Lean right: no (Sponsor Ranking)Right: no (Sponsor Ranking)LEAN LEFT(SPONSOR RANKING)ENERGY

4 members · Left 1 · Center 1 · Right 2 (Bill Ranking)

SponsorRep. Schrier, Kim (D-WA) (Introduced 05/29/2025)
Sponsor Voting RecordLean left · DW-NOMINATE -0.28 · measured from every roll-call vote this member has cast (voteview.com) (Sponsor Ranking)
Support
LLLCLRR

support across the spectrum: 4 members signed on (Bill Ranking) this bill: sponsor + current cosponsors, each once

CommitteesSenate - Energy and Natural Resources Committee; Senate - Energy and Natural Resources Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee
Latest Action06/10/2026 Committee on Energy and Natural Resources. Ordered to be reported without amendment favorably.
Roll Call VotesThere have been no roll call votes
Sourceview on congress.gov →
IntroducedPassed HousePassed SenateResolving DifferencesTo PresidentBecame Law

Summary (1)

Introduced in House (05/29/2025)

Hydropower Relicensing Transparency Act

This bill directs the Federal Energy Regulatory Commission to report annually to Congress on the status of the relicensing process for each application for a renewed hydropower dam license.

Text (4)

Engrossed in House (EH)

119 HR 3657 EH: Hydropower Licensing Transparency Act U.S. House of Representatives text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IB 119th CONGRESS1st Session H. R. 3657

IN THE HOUSE OF REPRESENTATIVES AN ACT To amend the Federal Power Act to require the Federal Energy Regulatory Commission to annually submit to Congress a report on the status of ongoing hydropower relicensing applications.

1.Short titleThis Act may be cited as the Hydropower Licensing Transparency Act.

2.Annual licensing status reportThe Federal Power Act is amended by inserting after section 36 (16 U.S.C. 823g) the following:

37.Annual licensing status report (a)In generalNot later than 180 days after the date of enactment of this section, and annually thereafter, the Commission shall submit to Congress a report on the status of— (1)the licensing process for each new license, and for each subsequent license for which sections 14 and 15 have been waived, for which the existing licensee has notified the Commission under section 15(b)(1) at least 3 years prior to submission of the report that such existing licensee intends to file an application for such new license or subsequent license, but such new license or subsequent license has not yet been issued under section 15; and (2)the licensing process for each original license under section 4(e) for which a citizen, association, corporation, State, Indian Tribe, or municipality has notified the Commission, pursuant to applicable regulations, at least 3 years prior to submission of the report that such citizen, association, corporation, State, Indian Tribe, or municipality intends to file an application for such original license, but such original license has not yet been issued under section 4(e). (b)InclusionsEach report submitted under subsection (a) shall include, with respect to the licensing process for each new license and subsequent license described in such subsection and the licensing process for each original license described in such subsection— (1)the date the notice of intent described in such subsection was provided to the Commission; (2)any docket number assigned with respect to such licensing process; (3)whether any application for such new license, such subsequent license, or such original license has been filed; (4)information regarding the status of any such application, including the date the Commission anticipates it will issue such original license, such subsequent license, or such new license; (5)the date of any upcoming proceeding or other meeting related to such original license, such subsequent license, or such new license; and (6)a description of any ongoing or completed actions required of the existing licensee, citizen, association, corporation, State, Indian Tribe, municipality, the Commission, the fish and wildlife agencies referred to in section 15(b), and any other agencies. (c)Disaggregation of information by license typeThe information included in each report submitted under subsection (a) shall be disaggregated by whether the information relates to a new license, or a subsequent license, issued under section 15 or an original license issued under section 4(e). . Passed the House of Representatives July 14, 2025.Kevin F. McCumber,Clerk.

Introduced in House (IH)

119 HR 3657 IH: Hydropower Relicensing Transparency Act U.S. House of Representatives 2025-05-29 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. I119th CONGRESS1st SessionH. R. 3657IN THE HOUSE OF REPRESENTATIVESMay 29, 2025Ms. Schrier (for herself and Mr. Fulcher) introduced the following bill; which was referred to the Committee on Energy and CommerceA BILLTo amend the Federal Power Act to require the Federal Energy Regulatory Commission to annually submit to Congress a report on the status of ongoing hydropower relicensing applications.

1.Short titleThis Act may be cited as the Hydropower Relicensing Transparency Act.

2.Annual relicensing status reportSection 15 of the Federal Power Act (16 U.S.C. 808) is amended by adding at the end the following: (g) (1)Not later than 180 days after the date of enactment of this subsection, and annually thereafter, the Commission shall submit to Congress a report on the status of the licensing process for each new license for which an existing licensee has notified the Commission under subsection (b)(1) at least 3 years prior to submission of the report that such licensee intends to file an application for such new license, but such new license has not yet been issued under this section. (2)Each report submitted under paragraph (1) shall include, with respect to the licensing process for each new license described in such paragraph— (A)the date notice was provided to the Commission under subsection (b)(1); (B)any docket number assigned with respect to such licensing process; (C)whether any application for a new license has been filed; (D)information regarding the status of any such application, including the date the Commission anticipates it will issue the new license; (E)any upcoming proceeding or other meeting related to such new license; and (F)any ongoing or completed actions required of the existing licensee, the Commission, the fish and wildlife agencies referred to in subsection (b) of this section, and any other agencies. .

Referred in Senate (RFS)

119 HR 3657 : Hydropower Licensing Transparency Act U.S. House of Representatives 2025-07-15 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IIB119th CONGRESS1st SessionH. R. 3657IN THE SENATE OF THE UNITED STATESJuly 15, 2025Received; read twice and referred to the Committee on Energy and Natural ResourcesAN ACTTo amend the Federal Power Act to require the Federal Energy Regulatory Commission to annually submit to Congress a report on the status of ongoing hydropower relicensing applications.1.Short titleThis Act may be cited as the Hydropower Licensing Transparency Act.2.Annual licensing status reportThe Federal Power Act is amended by inserting after section 36 (16 U.S.C. 823g) the following:37.Annual licensing status report(a)In generalNot later than 180 days after the date of enactment of this section, and annually thereafter, the Commission shall submit to Congress a report on the status of—(1)the licensing process for each new license, and for each subsequent license for which sections 14 and 15 have been waived, for which the existing licensee has notified the Commission under section 15(b)(1) at least 3 years prior to submission of the report that such existing licensee intends to file an application for such new license or subsequent license, but such new license or subsequent license has not yet been issued under section 15; and(2)the licensing process for each original license under section 4(e) for which a citizen, association, corporation, State, Indian Tribe, or municipality has notified the Commission, pursuant to applicable regulations, at least 3 years prior to submission of the report that such citizen, association, corporation, State, Indian Tribe, or municipality intends to file an application for such original license, but such original license has not yet been issued under section 4(e).(b)InclusionsEach report submitted under subsection (a) shall include, with respect to the licensing process for each new license and subsequent license described in such subsection and the licensing process for each original license described in such subsection—(1)the date the notice of intent described in such subsection was provided to the Commission;(2)any docket number assigned with respect to such licensing process;(3)whether any application for such new license, such subsequent license, or such original license has been filed;(4)information regarding the status of any such application, including the date the Commission anticipates it will issue such original license, such subsequent license, or such new license;(5)the date of any upcoming proceeding or other meeting related to such original license, such subsequent license, or such new license; and(6)a description of any ongoing or completed actions required of the existing licensee, citizen, association, corporation, State, Indian Tribe, municipality, the Commission, the fish and wildlife agencies referred to in section 15(b), and any other agencies.(c)Disaggregation of information by license typeThe information included in each report submitted under subsection (a) shall be disaggregated by whether the information relates to a new license, or a subsequent license, issued under section 15 or an original license issued under section 4(e). .Passed the House of Representatives July 14, 2025.Kevin F. McCumber,Clerk.

Reported in House (RH)

119 HR 3657 RH: Hydropower Licensing Transparency Act U.S. House of Representatives 2025-07-10 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IBUnion Calendar No. 157119th CONGRESS1st SessionH. R. 3657[Report No. 119–193]IN THE HOUSE OF REPRESENTATIVESMay 29, 2025Ms. Schrier (for herself and Mr. Fulcher) introduced the following bill; which was referred to the Committee on Energy and CommerceJuly 10, 2025Additional sponsors: Mr. Gray and Mr. LangworthyJuly 10, 2025Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printedStrike out all after the enacting clause and insert the part printed in italicFor text of introduced bill, see copy of bill as introduced on May 29, 2025A BILLTo amend the Federal Power Act to require the Federal Energy Regulatory Commission to annually submit to Congress a report on the status of ongoing hydropower relicensing applications.1.Short titleThis Act may be cited as the Hydropower Licensing Transparency Act.2.Annual licensing status reportThe Federal Power Act is amended by inserting after section 36 (16 U.S.C. 823g) the following:37.Annual licensing status report(a)In generalNot later than 180 days after the date of enactment of this section, and annually thereafter, the Commission shall submit to Congress a report on the status of—(1)the licensing process for each new license, and for each subsequent license for which sections 14 and 15 have been waived, for which the existing licensee has notified the Commission under section 15(b)(1) at least 3 years prior to submission of the report that such existing licensee intends to file an application for such new license or subsequent license, but such new license or subsequent license has not yet been issued under section 15; and(2)the licensing process for each original license under section 4(e) for which a citizen, association, corporation, State, Indian Tribe, or municipality has notified the Commission, pursuant to applicable regulations, at least 3 years prior to submission of the report that such citizen, association, corporation, State, Indian Tribe, or municipality intends to file an application for such original license, but such original license has not yet been issued under section 4(e).(b)InclusionsEach report submitted under subsection (a) shall include, with respect to the licensing process for each new license and subsequent license described in such subsection and the licensing process for each original license described in such subsection—(1)the date the notice of intent described in such subsection was provided to the Commission;(2)any docket number assigned with respect to such licensing process;(3)whether any application for such new license, such subsequent license, or such original license has been filed;(4)information regarding the status of any such application, including the date the Commission anticipates it will issue such original license, such subsequent license, or such new license;(5)the date of any upcoming proceeding or other meeting related to such original license, such subsequent license, or such new license; and(6)a description of any ongoing or completed actions required of the existing licensee, citizen, association, corporation, State, Indian Tribe, municipality, the Commission, the fish and wildlife agencies referred to in section 15(b), and any other agencies.(c)Disaggregation of information by license typeThe information included in each report submitted under subsection (a) shall be disaggregated by whether the information relates to a new license, or a subsequent license, issued under section 15 or an original license issued under section 4(e). .July 10, 2025Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed

The bill's own words, from our database (synced from the GPO BILLS XML); paragraph breaks added at the bill's section boundaries, nothing else changed.

All Actions (19)

DateChamberAll Actions
05/29/2025Library of CongressIntroduced in House
05/29/2025Library of CongressIntroduced in House
05/29/2025House floor actionsReferred to the House Committee on Energy and Commerce.
06/03/2025House committee actionsReferred to the Subcommittee on Energy.
06/05/2025House committee actionsSubcommittee Consideration and Mark-up Session Held
06/05/2025House committee actionsForwarded by Subcommittee to Full Committee by Voice Vote.
06/25/2025House committee actionsCommittee Consideration and Mark-up Session Held
06/25/2025House committee actionsOrdered to be Reported (Amended) by the Yeas and Nays: 47 - 0.
07/10/2025Library of CongressReported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-193.
07/10/2025House floor actionsReported (Amended) by the Committee on Energy and Commerce. H. Rept. 119-193.
07/10/2025House floor actionsPlaced on the Union Calendar, Calendar No. 157.
07/14/2025House floor actionsMr. Latta moved to suspend the rules and pass the bill, as amended.
07/14/2025House floor actionsConsidered under suspension of the rules. (consideration: CR H3221-3223)
07/14/2025House floor actionsDEBATE - The House proceeded with forty minutes of debate on H.R. 3657.
07/14/2025Library of CongressPassed/agreed to in House: On motion to suspend the rules and pass the bill, as amended Agreed to by voice vote.
07/14/2025House floor actionsOn motion to suspend the rules and pass the bill, as amended Agreed to by voice vote. (text: CR H3221-3222)
07/14/2025House floor actionsMotion to reconsider laid on the table Agreed to without objection.
07/15/2025SenateReceived in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.
06/10/2026SenateCommittee on Energy and Natural Resources. Ordered to be reported without amendment favorably.

Titles (7)

Title TypeTitle
Official Titles from EH (Engrossed in House) bill textTo amend the Federal Power Act to require the Federal Energy Regulatory Commission to annually submit to Congress a report on the status of ongoing hydropower relicensing applications.
Short Titles from RFS (Referred to Senate) bill textHydropower Licensing Transparency Act
Short Title(s) as Passed HouseHydropower Licensing Transparency Act
Display TitleHydropower Licensing Transparency Act
Short Title(s) as Reported to HouseHydropower Licensing Transparency Act
Short Title(s) as IntroducedHydropower Relicensing Transparency Act
Official Title as IntroducedTo amend the Federal Power Act to require the Federal Energy Regulatory Commission to annually submit to Congress a report on the status of ongoing hydropower relicensing applications.

Amendments (0)

There are no amendments to this bill.

Cosponsors (3)

* = Original cosponsor

Committees (5)

CommitteeActivity
Senate - Energy and Natural Resources Committee06/10/2026 Markup By
Senate - Energy and Natural Resources Committee07/15/2025 Referred To
House - Energy and Commerce Committee07/10/2025 Reported By
House - Energy and Commerce Committee06/25/2025 Markup By
House - Energy and Commerce Committee05/29/2025 Referred To

Related Bills (0)

No related bill information was received for H.R. 3657.

Subjects (3)

Policy Area: Energy

All data on this page comes from our own database (legislation.congress_* tables), synced daily from the GPO govinfo BILLSTATUS and BILLS collections. Formatted after congress.gov; nothing is generated. Member placement is their DW-NOMINATE score (voteview.com, Lewis et al.) - a measurement of roll-call voting behavior, not our judgement. Buckets: Left below −0.50 · Lean Left to −0.25 · Center to +0.25 · Lean Right to +0.50 · Right above +0.50. The bill's Support meter aggregates the people who signed the bill - sponsor and current cosponsors, each counted once - nothing else.