Improving Interagency Coordination for Pipeline Reviews Act

H.R. 3668 · 119th Congress (2025-2026)

H.R. 3668119TH CONGRESSINTRODUCED 06/02/2025REP. HUDSONR-NC · SPONSORLeft: no (Sponsor Ranking)Lean left: no (Sponsor Ranking)Center: no (Sponsor Ranking)Lean right: no (Sponsor Ranking)Right: DW-NOMINATE +0.52 (Sponsor Ranking)RIGHT(SPONSOR RANKING)ENERGY

4 members · Left 0 · Center 1 · Right 3 (Bill Ranking)

SponsorRep. Hudson, Richard (R-NC) (Introduced 06/02/2025)
Sponsor Voting RecordRight · DW-NOMINATE +0.52 · measured from every roll-call vote this member has cast (voteview.com) (Sponsor Ranking)
Support
LLLCLRR

support across the spectrum: 4 members signed on (Bill Ranking) this bill: sponsor + current cosponsors, each once

CommitteesSenate - Commerce, Science, and Transportation Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee; House - Energy and Commerce Committee; House - Transportation and Infrastructure Committee; House - Transportation and Infrastructure Committee
Latest Action12/15/2025 Received in the Senate and Read twice and referred to the Committee on Commerce, Science, and Transportation.
Roll Call Votes2
Sourceview on congress.gov →
IntroducedPassed HousePassed SenateResolving DifferencesTo PresidentBecame Law

Summary (1)

Reported to House (09/15/2025)

Improving Interagency Coordination for Pipeline Reviews Act

This bill expedites the environmental review of certain natural gas pipeline projects or liquefied natural gas (LNG) import or export terminals for authorizations under the Natural Gas Act.

Specifically, the bill makes the Federal Energy Regulatory Commission (FERC) the only lead agency for the purpose of coordinating the environmental review of such projects under the National Environmental Policy Act of 1969 (NEPA). Thus, agencies involved in the environmental review process must defer to FERC's approved scope for a NEPA review.

FERC must invite certain federal, state, local, or tribal governmental agencies to participate in the review process for an authorization and designate the applicable governments as participating agencies by deadlines established by the bill. In addition, FERC must consult with the Transportation Security Administration regarding various pipeline security measures.

The bill prohibits FERC from establishing a deadline for authorizing a project that is more than 90 days after the completion of the NEPA review. It also requires concurrent reviews when multiple federal or state agencies are involved.

Applicants for projects do not have to obtain a water quality certification from states under Section 401 of the Clean Water Act. FERC must coordinate its NEPA review with states where a potential discharge into navigable waters may occur.

If a federal or state agency requires an applicant for a pipeline authorization to submit data, the agency must consider any such data gathered by aerial or other remote means that is submitted.

Text (4)

Engrossed in House (EH)

119 HR 3668 EH: Improving Interagency Coordination for Pipeline Reviews Act U.S. House of Representatives text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IB 119th CONGRESS1st Session H. R. 3668

IN THE HOUSE OF REPRESENTATIVES AN ACT To promote interagency coordination for reviewing certain authorizations under section 3 of the Natural Gas Act, and for other purposes.

1.Short titleThis Act may be cited as the Improving Interagency Coordination for Pipeline Reviews Act.

2.Promoting interagency coordination for review of natural gas pipelines (a)DefinitionsIn this section: (1)CommissionThe term Commission means the Federal Energy Regulatory Commission. (2)Federal authorizationThe term Federal authorization has the meaning given that term in section 15(a) of the Natural Gas Act (15 U.S.C. 717n(a)). (3)NEPA reviewThe term NEPA review means the process of reviewing a proposed Federal action under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332). (4)Project-related NEPA reviewThe term project-related NEPA review means any NEPA review required to be conducted with respect to the issuance of an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act. (b)Commission NEPA review responsibilitiesIn acting as the lead agency under section 15(b)(1) of the Natural Gas Act for the purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall, in accordance with this section and other applicable Federal law— (1)be the only lead agency; (2)coordinate as early as practicable with each agency designated as a participating agency under subsection (d)(3) to ensure that the Commission develops information in conducting its project-related NEPA review that is usable by the participating agency in considering an aspect of an application for a Federal authorization for which the agency is responsible; and (3)take such actions as are necessary and proper to facilitate the expeditious resolution of its project-related NEPA review. (c)Deference to CommissionIn making a decision with respect to a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, each agency shall give deference, to the maximum extent authorized by law, to the scope of the project-related NEPA review that the Commission determines to be appropriate. (d)Participating agencies (1)IdentificationThe Commission shall identify, not later than 30 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, any Federal or State agency, local government, or Indian Tribe that may issue a Federal authorization or is required by Federal law to consult with the Commission in conjunction with the issuance of a Federal authorization required for such authorization or certificate. (2)Invitation (A)In generalNot later than 45 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall invite any agency identified under paragraph (1) to participate in the review process for the applicable Federal authorization. (B)DeadlineAn invitation issued under subparagraph (A) shall establish a deadline by which a response to the invitation shall be submitted to the Commission, which may be extended by the Commission for good cause. (3)Designation as participating agenciesNot later than 60 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall designate an agency identified under paragraph (1) as a participating agency with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act unless the agency informs the Commission, in writing, by the deadline established pursuant to paragraph (2)(B), that the agency— (A)has no jurisdiction or authority with respect to the applicable Federal authorization; (B)has no special expertise or information relevant to any project-related NEPA review; or (C)does not intend to submit comments for the record for the project-related NEPA review conducted by the Commission. (4)Effect of non-designation (A)Effect on agencyAny agency that is not designated as a participating agency under paragraph (3) with respect to an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act may not request or conduct a NEPA review that is supplemental to the project-related NEPA review conducted by the Commission, unless the agency— (i)demonstrates that such review is legally necessary for the agency to carry out responsibilities in considering an aspect of an application for a Federal authorization; and (ii)requires information that could not have been obtained during the project-related NEPA review conducted by the Commission. (B)Comments; recordThe Commission shall not, with respect to an agency that is not designated as a participating agency under paragraph (3) with respect to an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act— (i)consider any comments or other information submitted by such agency for the project-related NEPA review conducted by the Commission; or (ii)include any such comments or other information in the record for such project-related NEPA review. (e)Water quality impacts (1)In generalNotwithstanding section 401 of the Federal Water Pollution Control Act (33 U.S.C. 1341), an applicant for a Federal authorization shall not be required to provide a certification under such section with respect to the Federal authorization. (2)CoordinationWith respect to any NEPA review for a Federal authorization to conduct an activity that will directly result in a discharge into the navigable waters (within the meaning of the Federal Water Pollution Control Act), the Commission shall identify as an agency under subsection (d)(1) the State in which the discharge originates or will originate, or, if appropriate, the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate. (3)Proposed conditionsA State or interstate agency designated as a participating agency pursuant to paragraph (2) may propose to the Commission terms or conditions for inclusion in an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act that the State or interstate agency determines are necessary to ensure that any activity described in paragraph (2) conducted pursuant to such authorization or certification will comply with the applicable provisions of sections 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act. (4)Commission consideration of conditionsThe Commission may include a term or condition in an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act proposed by a State or interstate agency under paragraph (3) only if the Commission finds that the term or condition is necessary to ensure that any activity described in paragraph (2) conducted pursuant to such authorization or certification will comply with the applicable provisions of sections 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act. (f)Schedule (1)Deadline for Federal authorizationsA deadline for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act set by the Commission under section 15(c)(1) of such Act shall be not later than 90 days after the Commission completes its project-related NEPA review, unless an applicable schedule is otherwise established by Federal law. (2)Concurrent reviewsEach Federal and State agency— (A)that may consider an application for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act shall formulate and implement a plan for administrative, policy, and procedural mechanisms to enable the agency to ensure completion of Federal authorizations in compliance with schedules established by the Commission under section 15(c)(1) of such Act; and (B)in considering an aspect of an application for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, shall— (i)formulate and implement a plan to enable the agency to comply with the schedule established by the Commission under section 15(c)(1) of such Act; (ii)carry out the obligations of that agency under applicable law concurrently, and in conjunction with, the project-related NEPA review conducted by the Commission, and in compliance with the schedule established by the Commission under section 15(c)(1) of such Act, unless the agency notifies the Commission in writing that doing so would impair the ability of the agency to conduct needed analysis or otherwise carry out such obligations; (iii)transmit to the Commission a statement— (I)acknowledging receipt of the schedule established by the Commission under section 15(c)(1) of the Natural Gas Act; and (II)setting forth the plan formulated under clause (i) of this subparagraph; (iv)not later than 30 days after the agency receives such application for a Federal authorization, transmit to the applicant a notice— (I)indicating whether such application is ready for processing; and (II)if such application is not ready for processing, that includes a comprehensive description of the information needed for the agency to determine that the application is ready for processing; (v)determine that such application for a Federal authorization is ready for processing for purposes of clause (iv) if such application is sufficiently complete for the purposes of commencing consideration, regardless of whether supplemental information is necessary to enable the agency to complete the consideration required by law with respect to such application; and (vi)not less often than once every 90 days, transmit to the Commission a report describing the progress made in considering such application for a Federal authorization. (3)Failure to meet deadlineIf a Federal or State agency, including the Commission, fails to meet a deadline for a Federal authorization set forth in the schedule established by the Commission under section 15(c)(1) of the Natural Gas Act, not later than 5 days after such deadline, the head of the relevant Federal agency (including, in the case of a failure by a State agency, the Federal agency overseeing the delegated authority) shall notify Congress and the Commission of such failure and set forth a recommended implementation plan to ensure completion of the action to which such deadline applied. (g)Consideration of applications for Federal authorization (1)Issue identification and resolution (A)IdentificationFederal and State agencies that may consider an aspect of an application for a Federal authorization shall identify, as early as possible, any issues of concern that may delay or prevent an agency from working with the Commission to resolve such issues and granting such authorization. (B)Issue resolutionThe Commission may forward any issue of concern identified under subparagraph (A) to the heads of the relevant agencies (including, in the case of an issue of concern that is a failure by a State agency, the Federal agency overseeing the delegated authority, if applicable) for resolution. (2)Remote surveysIf a Federal or State agency considering an aspect of an application for a Federal authorization requires the person applying for such authorization to submit data, the agency shall consider any such data gathered by aerial or other remote means that the person submits. The agency may grant a conditional approval for the Federal authorization based on data gathered by aerial or remote means, conditioned on the verification of such data by subsequent onsite inspection. (3)Application processingThe Commission, and Federal and State agencies, may allow a person applying for a Federal authorization to fund a third-party contractor to assist in reviewing the application for such authorization. (h)Accountability, transparency, efficiencyFor an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act that requires multiple Federal authorizations, the Commission, with input from any Federal or State agency considering an aspect of the application, shall track and make available to the public on the Commission’s website information related to the actions required to complete the Federal authorizations. Such information shall include the following: (1)The schedule established by the Commission under section 15(c)(1) of the Natural Gas Act. (2)A list of all the actions required by each applicable agency to complete permitting, reviews, and other actions necessary to obtain a final decision on the application. (3)The expected completion date for each such action. (4)A point of contact at the agency responsible for each such action. (5)In the event that an action is still pending as of the expected date of completion, a brief explanation of the reasons for the delay. (i)Pipeline securityIn considering an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Federal Energy Regulatory Commission shall consult with the Administrator of the Transportation Security Administration regarding the applicant’s compliance with security guidance and best practice recommendations of the Administration regarding pipeline infrastructure security, pipeline cybersecurity, pipeline personnel security, and other pipeline security measures. Passed the House of Representatives December 12, 2025.Kevin F. McCumber,Clerk.

Introduced in House (IH)

119 HR 3668 IH: Improving Interagency Coordination for Pipeline Reviews Act U.S. House of Representatives 2025-06-02 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. I119th CONGRESS1st SessionH. R. 3668IN THE HOUSE OF REPRESENTATIVESJune 2, 2025Mr. Hudson (for himself and Mr. Balderson) introduced the following bill; which was referred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concernedA BILLTo promote interagency coordination for reviewing certain authorizations under section 3 of the Natural Gas Act, and for other purposes.

1.Short titleThis Act may be cited as the Improving Interagency Coordination for Pipeline Reviews Act.

2.Promoting interagency coordination for review of natural gas pipelines (a)DefinitionsIn this section: (1)CommissionThe term Commission means the Federal Energy Regulatory Commission. (2)Federal authorizationThe term Federal authorization has the meaning given that term in section 15(a) of the Natural Gas Act (15 U.S.C. 717n(a)). (3)NEPA reviewThe term NEPA review means the process of reviewing a proposed Federal action under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332). (4)Project-related NEPA reviewThe term project-related NEPA review means any NEPA review required to be conducted with respect to the issuance of an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act. (b)Commission NEPA review responsibilitiesIn acting as the lead agency under section 15(b)(1) of the Natural Gas Act for the purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall, in accordance with this section and other applicable Federal law— (1)be the only lead agency; (2)coordinate as early as practicable with each agency designated as a participating agency under subsection (d)(3) to ensure that the Commission develops information in conducting its project-related NEPA review that is usable by the participating agency in considering an aspect of an application for a Federal authorization for which the agency is responsible; and (3)take such actions as are necessary and proper to facilitate the expeditious resolution of its project-related NEPA review. (c)Deference to CommissionIn making a decision with respect to a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, each agency shall give deference, to the maximum extent authorized by law, to the scope of the project-related NEPA review that the Commission determines to be appropriate. (d)Participating agencies (1)IdentificationThe Commission shall identify, not later than 30 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, any Federal or State agency, local government, or Indian Tribe that may issue a Federal authorization or is required by Federal law to consult with the Commission in conjunction with the issuance of a Federal authorization required for such authorization or certificate. (2)Invitation (A)In generalNot later than 45 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall invite any agency identified under paragraph (1) to participate in the review process for the applicable Federal authorization. (B)DeadlineAn invitation issued under subparagraph (A) shall establish a deadline by which a response to the invitation shall be submitted to the Commission, which may be extended by the Commission for good cause. (3)Designation as participating agenciesNot later than 60 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall designate an agency identified under paragraph (1) as a participating agency with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act unless the agency informs the Commission, in writing, by the deadline established pursuant to paragraph (2)(B), that the agency— (A)has no jurisdiction or authority with respect to the applicable Federal authorization; (B)has no special expertise or information relevant to any project-related NEPA review; or (C)does not intend to submit comments for the record for the project-related NEPA review conducted by the Commission. (4)Effect of non-designation (A) Effect on agency Any agency that is not designated as a participating agency under paragraph (3) with respect to an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act may not request or conduct a NEPA review that is supplemental to the project-related NEPA review conducted by the Commission, unless the agency— (i) demonstrates that such review is legally necessary for the agency to carry out responsibilities in considering an aspect of an application for a Federal authorization; and (ii) requires information that could not have been obtained during the project-related NEPA review conducted by the Commission. (B)Comments; recordThe Commission shall not, with respect to an agency that is not designated as a participating agency under paragraph (3) with respect to an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act— (i) consider any comments or other information submitted by such agency for the project-related NEPA review conducted by the Commission; or (ii)include any such comments or other information in the record for such project-related NEPA review. (e)Water quality impacts (1)In generalNotwithstanding section 401 of the Federal Water Pollution Control Act (33 U.S.C. 1341), an applicant for a Federal authorization shall not be required to provide a certification under such section with respect to the Federal authorization. (2)CoordinationWith respect to any NEPA review for a Federal authorization to conduct an activity that will directly result in a discharge into the navigable waters (within the meaning of the Federal Water Pollution Control Act), the Commission shall identify as an agency under subsection (d)(1) the State in which the discharge originates or will originate, or, if appropriate, the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate. (3)Proposed conditionsA State or interstate agency designated as a participating agency pursuant to paragraph (2) may propose to the Commission terms or conditions for inclusion in an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act that the State or interstate agency determines are necessary to ensure that any activity described in paragraph (2) conducted pursuant to such authorization or certification will comply with the applicable provisions of sections 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act. (4)Commission consideration of conditionsThe Commission may include a term or condition in an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act proposed by a State or interstate agency under paragraph (3) only if the Commission finds that the term or condition is necessary to ensure that any activity described in paragraph (2) conducted pursuant to such authorization or certification will comply with the applicable provisions of sections 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act. (f)Schedule (1)Deadline for Federal authorizationsA deadline for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act set by the Commission under section 15(c)(1) of such Act shall be not later than 90 days after the Commission completes its project-related NEPA review, unless an applicable schedule is otherwise established by Federal law. (2)Concurrent reviewsEach Federal and State agency— (A)that may consider an application for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act shall formulate and implement a plan for administrative, policy, and procedural mechanisms to enable the agency to ensure completion of Federal authorizations in compliance with schedules established by the Commission under section 15(c)(1) of such Act; and (B)in considering an aspect of an application for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, shall— (i)formulate and implement a plan to enable the agency to comply with the schedule established by the Commission under section 15(c)(1) of such Act; (ii) carry out the obligations of that agency under applicable law concurrently, and in conjunction with, the project-related NEPA review conducted by the Commission, and in compliance with the schedule established by the Commission under section 15(c)(1) of such Act, unless the agency notifies the Commission in writing that doing so would impair the ability of the agency to conduct needed analysis or otherwise carry out such obligations; (iii)transmit to the Commission a statement— (I)acknowledging receipt of the schedule established by the Commission under section 15(c)(1) of the Natural Gas Act; and (II)setting forth the plan formulated under clause (i) of this subparagraph; (iv)not later than 30 days after the agency receives such application for a Federal authorization, transmit to the applicant a notice— (I)indicating whether such application is ready for processing; and (II)if such application is not ready for processing, that includes a comprehensive description of the information needed for the agency to determine that the application is ready for processing; (v)determine that such application for a Federal authorization is ready for processing for purposes of clause (iv) if such application is sufficiently complete for the purposes of commencing consideration, regardless of whether supplemental information is necessary to enable the agency to complete the consideration required by law with respect to such application; and (vi)not less often than once every 90 days, transmit to the Commission a report describing the progress made in considering such application for a Federal authorization. (3)Failure to meet deadlineIf a Federal or State agency, including the Commission, fails to meet a deadline for a Federal authorization set forth in the schedule established by the Commission under section 15(c)(1) of the Natural Gas Act, not later than 5 days after such deadline, the head of the relevant Federal agency (including, in the case of a failure by a State agency, the Federal agency overseeing the delegated authority) shall notify Congress and the Commission of such failure and set forth a recommended implementation plan to ensure completion of the action to which such deadline applied. (g)Consideration of applications for Federal authorization (1)Issue identification and resolution (A)IdentificationFederal and State agencies that may consider an aspect of an application for a Federal authorization shall identify, as early as possible, any issues of concern that may delay or prevent an agency from working with the Commission to resolve such issues and granting such authorization. (B)Issue resolutionThe Commission may forward any issue of concern identified under subparagraph (A) to the heads of the relevant agencies (including, in the case of an issue of concern that is a failure by a State agency, the Federal agency overseeing the delegated authority, if applicable) for resolution. (2)Remote surveysIf a Federal or State agency considering an aspect of an application for a Federal authorization requires the person applying for such authorization to submit data, the agency shall consider any such data gathered by aerial or other remote means that the person submits. The agency may grant a conditional approval for the Federal authorization based on data gathered by aerial or remote means, conditioned on the verification of such data by subsequent onsite inspection. (3)Application processingThe Commission, and Federal and State agencies, may allow a person applying for a Federal authorization to fund a third-party contractor to assist in reviewing the application for such authorization. (h)Accountability, transparency, efficiencyFor an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act that requires multiple Federal authorizations, the Commission, with input from any Federal or State agency considering an aspect of the application, shall track and make available to the public on the Commission’s website information related to the actions required to complete the Federal authorizations. Such information shall include the following: (1)The schedule established by the Commission under section 15(c)(1) of the Natural Gas Act. (2)A list of all the actions required by each applicable agency to complete permitting, reviews, and other actions necessary to obtain a final decision on the application. (3)The expected completion date for each such action. (4)A point of contact at the agency responsible for each such action. (5)In the event that an action is still pending as of the expected date of completion, a brief explanation of the reasons for the delay. (i)Pipeline securityIn considering an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Federal Energy Regulatory Commission shall consult with the Administrator of the Transportation Security Administration regarding the applicant’s compliance with security guidance and best practice recommendations of the Administration regarding pipeline infrastructure security, pipeline cybersecurity, pipeline personnel security, and other pipeline security measures.

Referred in Senate (RFS)

119 HR 3668 : Improving Interagency Coordination for Pipeline Reviews Act U.S. House of Representatives 2025-12-15 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IIB 119th CONGRESS1st Session H. R. 3668

IN THE SENATE OF THE UNITED STATES December 15, 2025 Received; read twice and referred to the Committee on Commerce, Science, and Transportation AN ACT To promote interagency coordination for reviewing certain authorizations under section 3 of the Natural Gas Act, and for other purposes.

1.Short titleThis Act may be cited as the Improving Interagency Coordination for Pipeline Reviews Act.

2.Promoting interagency coordination for review of natural gas pipelines (a)DefinitionsIn this section: (1)CommissionThe term Commission means the Federal Energy Regulatory Commission. (2)Federal authorizationThe term Federal authorization has the meaning given that term in section 15(a) of the Natural Gas Act (15 U.S.C. 717n(a)). (3)NEPA reviewThe term NEPA review means the process of reviewing a proposed Federal action under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332). (4)Project-related NEPA reviewThe term project-related NEPA review means any NEPA review required to be conducted with respect to the issuance of an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act. (b)Commission NEPA review responsibilitiesIn acting as the lead agency under section 15(b)(1) of the Natural Gas Act for the purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall, in accordance with this section and other applicable Federal law— (1)be the only lead agency; (2)coordinate as early as practicable with each agency designated as a participating agency under subsection (d)(3) to ensure that the Commission develops information in conducting its project-related NEPA review that is usable by the participating agency in considering an aspect of an application for a Federal authorization for which the agency is responsible; and (3)take such actions as are necessary and proper to facilitate the expeditious resolution of its project-related NEPA review. (c)Deference to CommissionIn making a decision with respect to a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, each agency shall give deference, to the maximum extent authorized by law, to the scope of the project-related NEPA review that the Commission determines to be appropriate. (d)Participating agencies (1)IdentificationThe Commission shall identify, not later than 30 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, any Federal or State agency, local government, or Indian Tribe that may issue a Federal authorization or is required by Federal law to consult with the Commission in conjunction with the issuance of a Federal authorization required for such authorization or certificate. (2)Invitation (A)In generalNot later than 45 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall invite any agency identified under paragraph (1) to participate in the review process for the applicable Federal authorization. (B)DeadlineAn invitation issued under subparagraph (A) shall establish a deadline by which a response to the invitation shall be submitted to the Commission, which may be extended by the Commission for good cause. (3)Designation as participating agenciesNot later than 60 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall designate an agency identified under paragraph (1) as a participating agency with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act unless the agency informs the Commission, in writing, by the deadline established pursuant to paragraph (2)(B), that the agency— (A)has no jurisdiction or authority with respect to the applicable Federal authorization; (B)has no special expertise or information relevant to any project-related NEPA review; or (C)does not intend to submit comments for the record for the project-related NEPA review conducted by the Commission. (4)Effect of non-designation (A)Effect on agencyAny agency that is not designated as a participating agency under paragraph (3) with respect to an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act may not request or conduct a NEPA review that is supplemental to the project-related NEPA review conducted by the Commission, unless the agency— (i)demonstrates that such review is legally necessary for the agency to carry out responsibilities in considering an aspect of an application for a Federal authorization; and (ii)requires information that could not have been obtained during the project-related NEPA review conducted by the Commission. (B)Comments; recordThe Commission shall not, with respect to an agency that is not designated as a participating agency under paragraph (3) with respect to an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act— (i)consider any comments or other information submitted by such agency for the project-related NEPA review conducted by the Commission; or (ii)include any such comments or other information in the record for such project-related NEPA review. (e)Water quality impacts (1)In generalNotwithstanding section 401 of the Federal Water Pollution Control Act (33 U.S.C. 1341), an applicant for a Federal authorization shall not be required to provide a certification under such section with respect to the Federal authorization. (2)CoordinationWith respect to any NEPA review for a Federal authorization to conduct an activity that will directly result in a discharge into the navigable waters (within the meaning of the Federal Water Pollution Control Act), the Commission shall identify as an agency under subsection (d)(1) the State in which the discharge originates or will originate, or, if appropriate, the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate. (3)Proposed conditionsA State or interstate agency designated as a participating agency pursuant to paragraph (2) may propose to the Commission terms or conditions for inclusion in an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act that the State or interstate agency determines are necessary to ensure that any activity described in paragraph (2) conducted pursuant to such authorization or certification will comply with the applicable provisions of sections 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act. (4)Commission consideration of conditionsThe Commission may include a term or condition in an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act proposed by a State or interstate agency under paragraph (3) only if the Commission finds that the term or condition is necessary to ensure that any activity described in paragraph (2) conducted pursuant to such authorization or certification will comply with the applicable provisions of sections 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act. (f)Schedule (1)Deadline for Federal authorizationsA deadline for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act set by the Commission under section 15(c)(1) of such Act shall be not later than 90 days after the Commission completes its project-related NEPA review, unless an applicable schedule is otherwise established by Federal law. (2)Concurrent reviewsEach Federal and State agency— (A)that may consider an application for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act shall formulate and implement a plan for administrative, policy, and procedural mechanisms to enable the agency to ensure completion of Federal authorizations in compliance with schedules established by the Commission under section 15(c)(1) of such Act; and (B)in considering an aspect of an application for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, shall— (i)formulate and implement a plan to enable the agency to comply with the schedule established by the Commission under section 15(c)(1) of such Act; (ii)carry out the obligations of that agency under applicable law concurrently, and in conjunction with, the project-related NEPA review conducted by the Commission, and in compliance with the schedule established by the Commission under section 15(c)(1) of such Act, unless the agency notifies the Commission in writing that doing so would impair the ability of the agency to conduct needed analysis or otherwise carry out such obligations; (iii)transmit to the Commission a statement— (I)acknowledging receipt of the schedule established by the Commission under section 15(c)(1) of the Natural Gas Act; and (II)setting forth the plan formulated under clause (i) of this subparagraph; (iv)not later than 30 days after the agency receives such application for a Federal authorization, transmit to the applicant a notice— (I)indicating whether such application is ready for processing; and (II)if such application is not ready for processing, that includes a comprehensive description of the information needed for the agency to determine that the application is ready for processing; (v)determine that such application for a Federal authorization is ready for processing for purposes of clause (iv) if such application is sufficiently complete for the purposes of commencing consideration, regardless of whether supplemental information is necessary to enable the agency to complete the consideration required by law with respect to such application; and (vi)not less often than once every 90 days, transmit to the Commission a report describing the progress made in considering such application for a Federal authorization. (3)Failure to meet deadlineIf a Federal or State agency, including the Commission, fails to meet a deadline for a Federal authorization set forth in the schedule established by the Commission under section 15(c)(1) of the Natural Gas Act, not later than 5 days after such deadline, the head of the relevant Federal agency (including, in the case of a failure by a State agency, the Federal agency overseeing the delegated authority) shall notify Congress and the Commission of such failure and set forth a recommended implementation plan to ensure completion of the action to which such deadline applied. (g)Consideration of applications for Federal authorization (1)Issue identification and resolution (A)IdentificationFederal and State agencies that may consider an aspect of an application for a Federal authorization shall identify, as early as possible, any issues of concern that may delay or prevent an agency from working with the Commission to resolve such issues and granting such authorization. (B)Issue resolutionThe Commission may forward any issue of concern identified under subparagraph (A) to the heads of the relevant agencies (including, in the case of an issue of concern that is a failure by a State agency, the Federal agency overseeing the delegated authority, if applicable) for resolution. (2)Remote surveysIf a Federal or State agency considering an aspect of an application for a Federal authorization requires the person applying for such authorization to submit data, the agency shall consider any such data gathered by aerial or other remote means that the person submits. The agency may grant a conditional approval for the Federal authorization based on data gathered by aerial or remote means, conditioned on the verification of such data by subsequent onsite inspection. (3)Application processingThe Commission, and Federal and State agencies, may allow a person applying for a Federal authorization to fund a third-party contractor to assist in reviewing the application for such authorization. (h)Accountability, transparency, efficiencyFor an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act that requires multiple Federal authorizations, the Commission, with input from any Federal or State agency considering an aspect of the application, shall track and make available to the public on the Commission’s website information related to the actions required to complete the Federal authorizations. Such information shall include the following: (1)The schedule established by the Commission under section 15(c)(1) of the Natural Gas Act. (2)A list of all the actions required by each applicable agency to complete permitting, reviews, and other actions necessary to obtain a final decision on the application. (3)The expected completion date for each such action. (4)A point of contact at the agency responsible for each such action. (5)In the event that an action is still pending as of the expected date of completion, a brief explanation of the reasons for the delay. (i)Pipeline securityIn considering an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Federal Energy Regulatory Commission shall consult with the Administrator of the Transportation Security Administration regarding the applicant’s compliance with security guidance and best practice recommendations of the Administration regarding pipeline infrastructure security, pipeline cybersecurity, pipeline personnel security, and other pipeline security measures. Passed the House of Representatives December 12, 2025.Kevin F. McCumber,Clerk.

Reported in House (RH)

119 HR 3668 RH: Improving Interagency Coordination for Pipeline Reviews Act U.S. House of Representatives 2025-09-15 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IBUnion Calendar No. 253119th CONGRESS1st SessionH. R. 3668[Report No. 119–297, Part I]IN THE HOUSE OF REPRESENTATIVESJune 2, 2025Mr. Hudson (for himself and Mr. Balderson) introduced the following bill; which was referred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concernedSeptember 15, 2025Additional sponsors: Mr. Dunn of Florida and Mr. LawlerSeptember 15, 2025Reported from the Committee on Energy and CommerceSeptember 15, 2025Committee on Transportation and Infrastructure discharged; committed to the Committee of the Whole House on the State of the Union and ordered to be printedA BILLTo promote interagency coordination for reviewing certain authorizations under section 3 of the Natural Gas Act, and for other purposes.1.Short titleThis Act may be cited as the Improving Interagency Coordination for Pipeline Reviews Act.2.Promoting interagency coordination for review of natural gas pipelines(a)DefinitionsIn this section:(1)CommissionThe term Commission means the Federal Energy Regulatory Commission.(2)Federal authorizationThe term Federal authorization has the meaning given that term in section 15(a) of the Natural Gas Act (15 U.S.C. 717n(a)).(3)NEPA reviewThe term NEPA review means the process of reviewing a proposed Federal action under section 102 of the National Environmental Policy Act of 1969 (42 U.S.C. 4332).(4)Project-related NEPA reviewThe term project-related NEPA review means any NEPA review required to be conducted with respect to the issuance of an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act.(b)Commission NEPA review responsibilitiesIn acting as the lead agency under section 15(b)(1) of the Natural Gas Act for the purposes of complying with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall, in accordance with this section and other applicable Federal law—(1)be the only lead agency;(2)coordinate as early as practicable with each agency designated as a participating agency under subsection (d)(3) to ensure that the Commission develops information in conducting its project-related NEPA review that is usable by the participating agency in considering an aspect of an application for a Federal authorization for which the agency is responsible; and(3)take such actions as are necessary and proper to facilitate the expeditious resolution of its project-related NEPA review.(c)Deference to CommissionIn making a decision with respect to a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, each agency shall give deference, to the maximum extent authorized by law, to the scope of the project-related NEPA review that the Commission determines to be appropriate.(d)Participating agencies(1)IdentificationThe Commission shall identify, not later than 30 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, any Federal or State agency, local government, or Indian Tribe that may issue a Federal authorization or is required by Federal law to consult with the Commission in conjunction with the issuance of a Federal authorization required for such authorization or certificate.(2)Invitation(A)In generalNot later than 45 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall invite any agency identified under paragraph (1) to participate in the review process for the applicable Federal authorization.(B)DeadlineAn invitation issued under subparagraph (A) shall establish a deadline by which a response to the invitation shall be submitted to the Commission, which may be extended by the Commission for good cause.(3)Designation as participating agenciesNot later than 60 days after the Commission receives an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Commission shall designate an agency identified under paragraph (1) as a participating agency with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act unless the agency informs the Commission, in writing, by the deadline established pursuant to paragraph (2)(B), that the agency—(A)has no jurisdiction or authority with respect to the applicable Federal authorization;(B)has no special expertise or information relevant to any project-related NEPA review; or(C)does not intend to submit comments for the record for the project-related NEPA review conducted by the Commission.(4)Effect of non-designation(A)Effect on agencyAny agency that is not designated as a participating agency under paragraph (3) with respect to an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act may not request or conduct a NEPA review that is supplemental to the project-related NEPA review conducted by the Commission, unless the agency—(i)demonstrates that such review is legally necessary for the agency to carry out responsibilities in considering an aspect of an application for a Federal authorization; and(ii)requires information that could not have been obtained during the project-related NEPA review conducted by the Commission.(B)Comments; recordThe Commission shall not, with respect to an agency that is not designated as a participating agency under paragraph (3) with respect to an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act—(i)consider any comments or other information submitted by such agency for the project-related NEPA review conducted by the Commission; or(ii)include any such comments or other information in the record for such project-related NEPA review.(e)Water quality impacts(1)In generalNotwithstanding section 401 of the Federal Water Pollution Control Act (33 U.S.C. 1341), an applicant for a Federal authorization shall not be required to provide a certification under such section with respect to the Federal authorization.(2)CoordinationWith respect to any NEPA review for a Federal authorization to conduct an activity that will directly result in a discharge into the navigable waters (within the meaning of the Federal Water Pollution Control Act), the Commission shall identify as an agency under subsection (d)(1) the State in which the discharge originates or will originate, or, if appropriate, the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate.(3)Proposed conditionsA State or interstate agency designated as a participating agency pursuant to paragraph (2) may propose to the Commission terms or conditions for inclusion in an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act that the State or interstate agency determines are necessary to ensure that any activity described in paragraph (2) conducted pursuant to such authorization or certification will comply with the applicable provisions of sections 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act.(4)Commission consideration of conditionsThe Commission may include a term or condition in an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act proposed by a State or interstate agency under paragraph (3) only if the Commission finds that the term or condition is necessary to ensure that any activity described in paragraph (2) conducted pursuant to such authorization or certification will comply with the applicable provisions of sections 301, 302, 303, 306, and 307 of the Federal Water Pollution Control Act.(f)Schedule(1)Deadline for Federal authorizationsA deadline for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act set by the Commission under section 15(c)(1) of such Act shall be not later than 90 days after the Commission completes its project-related NEPA review, unless an applicable schedule is otherwise established by Federal law.(2)Concurrent reviewsEach Federal and State agency—(A)that may consider an application for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act shall formulate and implement a plan for administrative, policy, and procedural mechanisms to enable the agency to ensure completion of Federal authorizations in compliance with schedules established by the Commission under section 15(c)(1) of such Act; and(B)in considering an aspect of an application for a Federal authorization required with respect to an application for authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, shall—(i)formulate and implement a plan to enable the agency to comply with the schedule established by the Commission under section 15(c)(1) of such Act;(ii)carry out the obligations of that agency under applicable law concurrently, and in conjunction with, the project-related NEPA review conducted by the Commission, and in compliance with the schedule established by the Commission under section 15(c)(1) of such Act, unless the agency notifies the Commission in writing that doing so would impair the ability of the agency to conduct needed analysis or otherwise carry out such obligations;(iii)transmit to the Commission a statement—(I)acknowledging receipt of the schedule established by the Commission under section 15(c)(1) of the Natural Gas Act; and(II)setting forth the plan formulated under clause (i) of this subparagraph;(iv)not later than 30 days after the agency receives such application for a Federal authorization, transmit to the applicant a notice—(I)indicating whether such application is ready for processing; and(II)if such application is not ready for processing, that includes a comprehensive description of the information needed for the agency to determine that the application is ready for processing;(v)determine that such application for a Federal authorization is ready for processing for purposes of clause (iv) if such application is sufficiently complete for the purposes of commencing consideration, regardless of whether supplemental information is necessary to enable the agency to complete the consideration required by law with respect to such application; and(vi)not less often than once every 90 days, transmit to the Commission a report describing the progress made in considering such application for a Federal authorization.(3)Failure to meet deadlineIf a Federal or State agency, including the Commission, fails to meet a deadline for a Federal authorization set forth in the schedule established by the Commission under section 15(c)(1) of the Natural Gas Act, not later than 5 days after such deadline, the head of the relevant Federal agency (including, in the case of a failure by a State agency, the Federal agency overseeing the delegated authority) shall notify Congress and the Commission of such failure and set forth a recommended implementation plan to ensure completion of the action to which such deadline applied.(g)Consideration of applications for Federal authorization(1)Issue identification and resolution(A)IdentificationFederal and State agencies that may consider an aspect of an application for a Federal authorization shall identify, as early as possible, any issues of concern that may delay or prevent an agency from working with the Commission to resolve such issues and granting such authorization.(B)Issue resolutionThe Commission may forward any issue of concern identified under subparagraph (A) to the heads of the relevant agencies (including, in the case of an issue of concern that is a failure by a State agency, the Federal agency overseeing the delegated authority, if applicable) for resolution.(2)Remote surveysIf a Federal or State agency considering an aspect of an application for a Federal authorization requires the person applying for such authorization to submit data, the agency shall consider any such data gathered by aerial or other remote means that the person submits. The agency may grant a conditional approval for the Federal authorization based on data gathered by aerial or remote means, conditioned on the verification of such data by subsequent onsite inspection.(3)Application processingThe Commission, and Federal and State agencies, may allow a person applying for a Federal authorization to fund a third-party contractor to assist in reviewing the application for such authorization.(h)Accountability, transparency, efficiencyFor an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act that requires multiple Federal authorizations, the Commission, with input from any Federal or State agency considering an aspect of the application, shall track and make available to the public on the Commission’s website information related to the actions required to complete the Federal authorizations. Such information shall include the following:(1)The schedule established by the Commission under section 15(c)(1) of the Natural Gas Act.(2)A list of all the actions required by each applicable agency to complete permitting, reviews, and other actions necessary to obtain a final decision on the application.(3)The expected completion date for each such action.(4)A point of contact at the agency responsible for each such action.(5)In the event that an action is still pending as of the expected date of completion, a brief explanation of the reasons for the delay.(i)Pipeline securityIn considering an application for an authorization under section 3 of the Natural Gas Act or a certificate of public convenience and necessity under section 7 of such Act, the Federal Energy Regulatory Commission shall consult with the Administrator of the Transportation Security Administration regarding the applicant’s compliance with security guidance and best practice recommendations of the Administration regarding pipeline infrastructure security, pipeline cybersecurity, pipeline personnel security, and other pipeline security measures.September 15, 2025Reported from the Committee on Energy and CommerceSeptember 15, 2025Committee on Transportation and Infrastructure discharged; committed to the Committee of the Whole House on the State of the Union and ordered to be printed

The bill's own words, from our database (synced from the GPO BILLS XML); paragraph breaks added at the bill's section boundaries, nothing else changed.

All Actions (28)

DateChamberAll Actions
06/02/2025Library of CongressIntroduced in House
06/02/2025Library of CongressIntroduced in House
06/02/2025House floor actionsReferred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
06/02/2025House floor actionsReferred to the Committee on Energy and Commerce, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
06/03/2025House committee actionsReferred to the Subcommittee on Energy.
06/05/2025House committee actionsSubcommittee Consideration and Mark-up Session Held
06/05/2025House committee actionsForwarded by Subcommittee to Full Committee by the Yeas and Nays: 15 - 11.
06/25/2025House committee actionsCommittee Consideration and Mark-up Session Held
06/25/2025House committee actionsOrdered to be Reported by the Yeas and Nays: 27 - 23.
09/15/2025Library of CongressReported by the Committee on Energy and Commerce. H. Rept. 119-297, Part I.
09/15/2025House floor actionsReported by the Committee on Energy and Commerce. H. Rept. 119-297, Part I.
09/15/2025Library of CongressCommittee on Transportation discharged.
09/15/2025House floor actionsCommittee on Transportation discharged.
09/15/2025House floor actionsPlaced on the Union Calendar, Calendar No. 253.
11/25/2025Library of CongressSupplemental report filed by the Committee on Energy and Commerce, H. Rept. 119-297, Part II.
11/25/2025House floor actionsSupplemental report filed by the Committee on Energy and Commerce, H. Rept. 119-297, Part II.
12/09/2025House floor actionsRules Committee Resolution H. Res. 936 Reported to House. Rule provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, H.R. 3668 and S. 1071. The resolution provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, and H.R. 3628 under a structured rule; and H.R. 3668 and S. 1071 under a closed rule. The resolution provides for one motion to recommit on H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, and H.R. 3668; and one motion to commit on S. 1071.
12/12/2025House floor actionsConsidered under the provisions of rule H. Res. 936. (consideration: CR H5814-5822)
12/12/2025House floor actionsRule provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, H.R. 3668 and S. 1071. The resolution provides for consideration of H.R. 3898, H.R. 3383, H.R. 3638, and H.R. 3628 under a structured rule; and H.R. 3668 and S. 1071 under a closed rule. The resolution provides for one motion to recommit on H.R. 3898, H.R. 3383, H.R. 3638, H.R. 3628, and H.R. 3668; and one motion to commit on S. 1071.
12/12/2025House floor actionsDEBATE - The House proceeded with one hour of debate on H.R. 3668.
12/12/2025House floor actionsThe previous question was ordered pursuant to the rule.
12/12/2025House floor actionsMr. Landsman moved to recommit to the Committee on Energy and Commerce. (text: CR H5820)
12/12/2025House floor actionsThe previous question on the motion to recommit was ordered pursuant to clause 2(b) of rule XIX.
12/12/2025House floor actionsOn motion to recommit Failed by the Yeas and Nays: 194 - 204 (Roll no. 333).
12/12/2025Library of CongressPassed/agreed to in House: On passage Passed by the Yeas and Nays: 213 - 184 (Roll no. 334).
12/12/2025House floor actionsOn passage Passed by the Yeas and Nays: 213 - 184 (Roll no. 334). (text: CR H5814-5816)
12/12/2025House floor actionsMotion to reconsider laid on the table Agreed to without objection.
12/15/2025SenateReceived in the Senate and Read twice and referred to the Committee on Commerce, Science, and Transportation.

Titles (7)

Title TypeTitle
Short Titles from RFS (Referred to Senate) bill textImproving Interagency Coordination for Pipeline Reviews Act
Short Title(s) as Passed HouseImproving Interagency Coordination for Pipeline Reviews Act
Official Titles from EH (Engrossed in House) bill textTo promote interagency coordination for reviewing certain authorizations under section 3 of the Natural Gas Act, and for other purposes.
Short Title(s) as Reported to HouseImproving Interagency Coordination for Pipeline Reviews Act
Display TitleImproving Interagency Coordination for Pipeline Reviews Act
Short Title(s) as IntroducedImproving Interagency Coordination for Pipeline Reviews Act
Official Title as IntroducedTo promote interagency coordination for reviewing certain authorizations under section 3 of the Natural Gas Act, and for other purposes.

Amendments (0)

There are no amendments to this bill.

Cosponsors (3)

* = Original cosponsor

Committees (9)

CommitteeActivity
Senate - Commerce, Science, and Transportation Committee12/15/2025 Referred To
House - Energy and Commerce Committee12/12/2025 Unknown
House - Energy and Commerce Committee12/12/2025 Unknown
House - Energy and Commerce Committee11/25/2025 Reported By
House - Energy and Commerce Committee09/15/2025 Reported By
House - Energy and Commerce Committee06/25/2025 Markup By
House - Energy and Commerce Committee06/02/2025 Referred To
House - Transportation and Infrastructure Committee09/15/2025 Discharged From
House - Transportation and Infrastructure Committee06/02/2025 Referred To

Related Bills (1)

Subjects (11)

Policy Area: Energy

All data on this page comes from our own database (legislation.congress_* tables), synced daily from the GPO govinfo BILLSTATUS and BILLS collections. Formatted after congress.gov; nothing is generated. Member placement is their DW-NOMINATE score (voteview.com, Lewis et al.) - a measurement of roll-call voting behavior, not our judgement. Buckets: Left below −0.50 · Lean Left to −0.25 · Center to +0.25 · Lean Right to +0.50 · Right above +0.50. The bill's Support meter aggregates the people who signed the bill - sponsor and current cosponsors, each counted once - nothing else.