Congressional Legislation · bill 119hr4776 · built from our database

Both sides have signed this (Bill Ranking)

SPEED Act

H.R. 4776 · 119th Congress (2025-2026)

H.R. 4776119TH CONGRESSINTRODUCED 07/25/2025REP. WESTERMANR-AR · SPONSORLeft: no (Sponsor Ranking)Lean left: no (Sponsor Ranking)Center: no (Sponsor Ranking)Lean right: no (Sponsor Ranking)Right: DW-NOMINATE +0.54 (Sponsor Ranking)RIGHT(SPONSOR RANKING)ENVIRONMENTAL PROTECTION

15 members · Left 1 · Center 6 · Right 8 (Bill Ranking)

SponsorRep. Westerman, Bruce (R-AR) (Introduced 07/25/2025)
Sponsor Voting RecordRight · DW-NOMINATE +0.54 · measured from every roll-call vote this member has cast (voteview.com) (Sponsor Ranking)
Support
LLLCLRR

support across the spectrum: 15 members signed on (Bill Ranking) this bill: sponsor + current cosponsors, each once

CommitteesSenate - Environment and Public Works Committee; House - Natural Resources Committee; House - Natural Resources Committee; House - Natural Resources Committee; House - Natural Resources Committee; House - Natural Resources Committee; House - Natural Resources Committee; House - Natural Resources Committee
Latest Action12/18/2025 Received in the Senate and Read twice and referred to the Committee on Environment and Public Works.
Roll Call Votes2
Sourceview on congress.gov →
IntroducedPassed HousePassed SenateResolving DifferencesTo PresidentBecame Law

Summary (1)

Reported to House (12/04/2025)

Standardizing Permitting and Expediting Economic Development Act or the SPEED Act

This bill limits the scope of the National Environmental Policy Act of 1969 (NEPA) and modifies the environmental review of major federal actions under NEPA to generally limit the number of federal actions that trigger NEPA review and to expedite the review process.

For example, the bill redefines major federal actions, including to specify that an agency may not determine that an action is a major federal action based solely on the provision of federal funds.

It also excludes from the requirement for NEPA review certain proposed agency actions that have already been reviewed under another federal, state, or tribal environmental review statute that meets the requirements of NEPA.

The bill directs an agency, when preparing an environmental document for a proposed agency action, to consider only those effects proximately caused by the immediate project or action under consideration. Agencies may not consider effects that are speculative, attenuated from the project or action, separate in time or place from the project or action, or in relation to separate projects or actions.

The bill modifies the requirement for agencies to prepare an environmental assessment to apply to agency actions that are not likely to have a reasonably foreseeable significant effect on the quality of the human environment. (Currently, the requirement only applies to actions that do not have such an effect.)

The bill makes a variety of other modifications to NEPA, including by limiting judicial review of NEPA cases.

Text (4)

Engrossed in House (EH)

119 HR 4776 EH: Standardizing Permitting and Expediting Economic Development Act U.S. House of Representatives text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IB 119th CONGRESS1st Session H. R. 4776

IN THE HOUSE OF REPRESENTATIVES AN ACT To amend the National Environmental Policy Act of 1969 to clarify ambiguous provisions and facilitate a more efficient, effective, and timely environmental review process.

1.Short titleThis Act may be cited as the Standardizing Permitting and Expediting Economic Development Act or the SPEED Act.

2.NEPA reform (a)PurposeSection 2 of the National Environmental Policy Act of 1969 (42 U.S.C. 4321) is amended— (1)by striking The purposes and inserting (a) The purposes; and (2)by adding at the end the following: (b)This Act is a purely procedural statute intended to ensure Federal agencies consider the environmental impacts of their actions during the decisionmaking process. This Act does not mandate particular results, and only prescribes a process. Nothing in this Act shall be construed to mandate any specific environmental outcome or result, nor shall this Act be interpreted to confer substantive rights or impose substantive duties beyond procedural requirements.. (b)Procedure for determination of level of reviewSection 106 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336) is amended— (1)in the heading, by inserting ; scope of review after level of review; (2)in subsection (a)— (A)in paragraph (3), by striking or; (B)in paragraph (4), by striking action. and inserting action;; and (C)by adding at the end the following: (5)the agency determines the proposed agency action is an action for which such agency’s compliance with another statute’s requirements serves the function of agency compliance with this Act with respect to such action; or (6)the proposed agency action relates to a project or action that has already been reviewed pursuant to a State environmental review statute or a Tribal environmental review statute, ordinance, resolution, regulation, or formally adopted policy and the lead agency determines such review serves the function of agency compliance with this Act.; (3)in subsection (b)— (A)in paragraph (2), by striking does not and inserting is not likely to; and (B)in paragraph (3), by amending subparagraph (B) to read as follows: (B)is not required to— (i)undertake new scientific or technical research unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable; or (ii)undertake new scientific or technical research after the receipt of an application, as applicable, with respect to a proposed agency action.; and (4)by adding at the end the following: (c)Scope of reviewIn preparing an environmental document for a proposed agency action, a Federal agency— (1)may consider only those effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and (2)may not consider effects that are speculative, attenuated from the project or action, separate in time or place from the project or action, or in relation to separate existing or potential future projects or actions. (d)Certainty (1)Environmental documentsA Federal agency may not rescind, withdraw, amend, alter, or otherwise render ineffective any environmental document completed under this Act for a project or action where there is an applicant unless the Federal agency has been so ordered by a court or the applicant has agreed in writing to such rescission, withdrawal, amendment, or alteration. (2)Authorizations (A)In generalExcept as provided in this subsection or existing law, a Federal agency may not revoke, rescind, withdraw, terminate, suspend, amend, alter, or take any other action to interfere with an authorization unless— (i)the Federal agency is required to take such action by order of a court of competent jurisdiction; (ii)the holder of the authorization has materially breached the terms of the authorization, or otherwise violated applicable law; (iii)the authorization was obtained through fraud, intentional concealment, or material misrepresentation; (iv)such action is necessary to prevent specific, immediate, substantial, and proximate harm or damage to life, property, national security, or defense that was not considered in the underlying environmental review process or final agency action for the authorization; or (v)the Federal agency has received a request from the holder of the authorization or project sponsor to take such action. (B)RequirementThe actions described in subparagraph (A) shall be, as appropriate and where feasible, supported by clear and convincing evidence and reasonably limited in duration and scope by the agency to address the specific issue such action is intended to address. (C)NoticeBefore an agency takes an action described in subparagraph (A), the agency shall notify the holder of the authorization and the project sponsor in writing of such action, including by providing a detailed explanation of the action, identifying the statutory authority relied upon for the action, and providing the evidence supporting the action. (D)Judicial review (i)In generalAn action described in subparagraph (A) shall be subject to judicial review under chapter 7 of title 5, United States Code. (ii)VenueA person seeking judicial review of an action described in subparagraph (A) may only obtain review of such action in the United States court of appeals for any circuit wherein the project for which the authorization was issued is located. (iii)Petitions by Federal agenciesNo Federal agency may petition a court for vacatur or voluntary remand of an authorization unless the holder of the authorization or the project sponsor consents in writing to such a petition. (E)Savings clauseNothing in subparagraph (A) shall be construed to provide any Federal agency new, enhanced, or expanded authority, or to limit any existing authority, concerning any authorization. (e)Presumption of negative impacts of taking no action relating to tribal trust resourcesFor any proposed agency action carried out on, or directly affecting, tribal trust resources (including lands and minerals) that is initiated by the federally recognized Indian Tribe for which the United States holds the affected resources in trust, and for which an environmental document was prepared that included consideration of a no action alternative, there shall be a presumption that the effects of taking no action will be negative for the federally recognized Indian Tribe. (f)Effect of threshold determinations on other agenciesIf a lead agency determines an environmental document is not required to be prepared with respect to a proposed agency action under subsection (a), another agency may not prepare an environmental document with respect to such proposed agency action.. (c)Timely and unified Federal reviews (1)Lead AgencySection 107(a) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(a)) is amended— (A)in paragraph (2)— (i)in subparagraph (B), by striking at the earliest practicable time and inserting in accordance with subsection (g)(2); (ii)in subparagraph (D), by striking carry out the proposed agency action and inserting carry out the proposed agency action in compliance with the deadlines outlined in subsection (g); and (iii)in subparagraph (E)— (I)by striking a review and inserting an environmental review; and (II)by striking such review and inserting such environmental review; and (B)in paragraph (3)— (i)by inserting (including counties, boroughs, parishes, and other political subdivisions of a State) after local agency; and (ii)by adding at the end Such comments from Federal cooperating agencies shall be limited to matters relating to the proposed agency action with respect to which such Federal cooperating agency has jurisdiction by law.. (2)One documentSection 107(b) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(b)) is amended— (A)by striking To the extent practicable, and inserting the following: (1)DocumentTo the extent practicable,; and (B)by adding at the end the following: (2)Consideration timing (A)In generalIn preparing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the earlier of, as applicable— (i)the date of receipt of an application with respect to such proposed agency action; and (ii)the date of publication of a notice of intent or decision to prepare such environmental document for such proposed agency action. (B)Applicability to other lawThis paragraph does not affect any review of information required under subchapter II of chapter 5 of title 5, United States Code, with respect to comments received during the public comment period as applicable. (C)DelayA Federal agency may not delay the issuance of an environmental document or a final agency action, including any decision or determination, on the basis of awaiting new scientific or technical research or information that was not available as of the earlier of the dates described in subparagraph (A).. (3)Statement of Purpose and NeedSection 107(d) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(d)) is amended by striking action. and inserting action. Where applicable, the statement of purpose and need shall meet the goals of the applicant.. (4)DeadlinesSection 107(g) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(g)) is amended— (A)by redesignating paragraphs (1), (2), and (3) as paragraphs (3), (5), and (6), respectively; (B)by inserting before paragraph (3) (as so redesignated) the following: (1)Applications for authorizations (A)Notification of complete or incomplete applicationUnless a shorter deadline is specified by law, in connection with a proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 60 days after the date on which the applicant submits the application to the agency, the agency shall document the receipt of the application and— (i)notify the applicant that the application is complete; or (ii)notify the applicant that the application is incomplete and request in writing any additional information that the agency needs to determine that the application is complete and begin preparation of an environmental document. (B)Agency determination (i)Complete determinationIf an agency determines an application is complete under subparagraph (A)(i), the agency shall, not later than 60 days after the date on which the agency makes such determination— (I)notify the applicant that the agency has determined that the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, is not a major Federal action, or that no further agency action is required; (II)issue a notice of intent to prepare an environmental impact statement for such proposed agency action; or (III)notify the applicant that the agency has determined that preparation of an environmental assessment is necessary. (ii)Incomplete determinationIf the agency requests additional information under subparagraph (A)(ii), the deadline described in clause (i) shall be based on the date on which the agency receives the additional information instead of the date on which the determination is made. (2)Cooperating agencies (A)In generalNot later than 21 days after a lead agency issues a notice of intent under paragraph (1)(B)(i)(II) or notifies an applicant under paragraph (1)(B)(i)(III) with respect to a proposed agency action, the lead agency shall— (i)identify all agencies that are likely to have environmental review, authorization, or other responsibilities with respect to the proposed agency action; and (ii)invite each such agency to become a cooperating agency. (B)Deadline to accept invitationNot later than 21 days after an agency receives an invitation to become a cooperating agency under subparagraph (A)(ii), such agency shall accept or deny the invitation. (C)Convening of cooperating agenciesNot later than 7 days after the deadline described in subparagraph (B) has passed for each agency that received an invitation to become a cooperating agency under subparagraph (A)(ii), the lead agency that sent each such invitation shall convene each agency that accepts such an invitation to coordinate on developing the schedule under subsection (a)(2)(D) for the applicable proposed agency action. (D)Unidentified agenciesIn the event that an agency that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposed agency action is not identified under subparagraph (A)(i), the lead agency with respect to the proposed agency action shall— (i)invite such unidentified agency to become a cooperating agency by not later than 7 days after becoming aware that the agency has jurisdiction by law or special expertise; and (ii)if such agency accepts the invitation, incorporate such agency into the schedule developed under subsection (a)(2)(D) and update such schedule accordingly by not later than 14 days after the date on which such agency accepts the invitation.; (C)in paragraph (3) (as so redesignated)— (i)by striking In general and inserting Review timeline; and (ii)by striking (2) and inserting (5); (D)by inserting after paragraph (3) (as so redesignated) the following: (4)Deadline for final agency actionFor any proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 30 days after completing an environmental impact statement or an environmental assessment for the proposed agency action, the lead agency, and any cooperating agency, shall issue a final agency action. The agency issuing such final agency action shall include in the final agency action a performance schedule for the completion of any other outstanding authorizations.; (E)in paragraph (5) (as so redesignated)— (i)by striking the deadline described in paragraph (1) and inserting a deadline described in this subsection; and (ii)by striking , in consultation with the applicant, to and inserting if the applicant approves such extension. If the applicant approves such extension, the lead agency shall; (F)in paragraph (6) (as so redesignated)— (i)by striking A project sponsor may and inserting Except as provided in subparagraph (C), a project sponsor may; and (ii)by adding at the end the following: (C)ExceptionA project sponsor that approved an extension of a deadline under paragraph (5) may not obtain judicial review of a failure to act in accordance with such deadline under subparagraph (A) unless the lead agency fails to meet the new deadline or is delaying for reasons other than those necessary to complete its review.; and (G)by adding at the end the following: (7)Concurrent reviewIn carrying out an environmental review, the lead agency and each cooperating agency shall carry out the obligations of that agency under other applicable laws concurrently, and in conjunction, with other required reviews for the proposed agency action, pursuant to the requirements of applicable law, including, if applicable, under this Act.. (d)Programmatic environmental documentsSection 108 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336b) is amended— (1)by striking When an agency prepares and inserting the following: (a)Programmatic environmental documentsWhen an agency prepares; (2)in paragraph (1), by striking 5 and inserting 10; (3)in paragraph (2), by striking 5 and inserting 10; and (4)by adding at the end the following: (b)Reliance on previously completed environmental reviews (1)Actions that are substantially the sameA lead agency may satisfy the requirements of this Act with respect to a major Federal action by relying on an environmental assessment, environmental impact statement, or a categorical exclusion determination that the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency completed for another major Federal action if the lead agency determines that— (A)the new major Federal action is substantially the same as the other major Federal action or, if applicable, an alternative analyzed in such environmental assessment or environmental impact statement; and (B)if applicable, the effects of the new major Federal action are substantially the same as the effects analyzed in such environmental assessment or environmental impact statement. (2)Actions that are not substantially the sameIf a new major Federal action is not substantially the same as another major Federal action or an alternative analyzed in an environmental assessment or environmental impact statement completed by the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency, the lead agency may modify or augment any such previously completed environmental assessment or environmental impact statement as necessary to satisfy the requirements of this Act with respect to the new major Federal action. The lead agency shall make such modified environmental assessment or environmental impact statement publicly available as a new environmental assessment or environmental impact statement.. (e)Adoption of categorical exclusionsSection 109 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336c) is amended in the text preceding paragraph (1), by inserting , or that was legislatively enacted by Congress, after procedures. (f)DefinitionsSection 111 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336e) is amended— (1)by redesignating paragraphs (1) through (13) as paragraphs (2) through (14), respectively; (2)by inserting before paragraph (2) (as so redesignated) the following: (1)AuthorizationThe term authorization means any lease, right-of-way, easement, license, permit, approval, finding, determination, or other administrative decision issued by an agency or any interagency consultation that is required or authorized under Federal law in order to construct, modify, or operate a project.; (3)in paragraph (2) (as so redesignated), by inserting , or Congress deems by statute, after Federal agency has determined; (4)in paragraph (11) (as so redesignated)— (A)in subparagraph (B)— (i)in clause (iii)— (I)by inserting grants (including capitalization grants), cost share awards, after loan guarantees,; (II)by striking sufficient and inserting complete; and (III)by striking subsequent use of such financial assistance or the; (ii)by redesignating clauses (iv) through (vii) as clauses (vi) through (ix), respectively; and (iii)by inserting after clause (iii) the following: (iv)farm ownership loans and operating loan guarantees by the Farm Service Agency pursuant to sections 305 and 311 through 319 of the Consolidated Farm and Rural Development Act; (v)the issuance of an authorization by an agency where the effects of the action or project being permitted or authorized were previously evaluated by another agency in compliance with this Act;; and (B)by adding at the end the following: (C)Additional exclusionsAn agency action may not be determined to be a major Federal action solely on the basis of the provision of Federal funds, including a grant, loan, loan guarantee, and funding assistance.; and (5)by adding at the end the following: (15)Reasonably foreseeableThe term reasonably foreseeable, with respect to environmental effects of a proposed agency action— (A)means effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and (B)does not include effects that are— (i)speculative; (ii)attenuated from the proposed agency action; (iii)separate in time or place from the proposed agency action; or (iv)in relation to separate existing or potential future projects.. (g)DutiesSection 204 of the National Environmental Policy Act of 1969 (42 U.S.C. 4344) is amended in paragraph (4) by inserting energy, after health,.

3.Judicial reviewTitle I of the National Environmental Policy Act of 1969 (42 U.S.C. 4331 et seq.) is amended— (1)by redesignating section 112 as section 110A and moving such section so as to appear after section 110; and (2)by inserting before section 111 the following: 110B.Judicial review (a)Role of the courtIn reviewing a claim of whether a final agency action complies with the requirements of this Act, a court— (1)shall afford substantial deference to the agency; and (2)may not substitute its judgment for that of the agency regarding the environmental effects included in the final agency action or included in the environmental document. (b)Remand (1)In generalIf a court holds, under section 706(2)(A) of title 5, United States Code, that a final agency action does not comply with the requirements of this Act, the only remedy the court may order, notwithstanding chapter 7 of title 5, United States Code, is to remand, without vacatur or injunction, the final agency action to the agency with— (A)specific instruction to correct the errors or deficiencies found by the court; and (B)a reasonable schedule and deadline to correct such errors or deficiencies, which such deadline may not exceed— (i)with regard to an order entered on or after the date of enactment of this section, the date that is 180 days after the date on which the order was entered; and (ii)with regard to an order entered before the date of enactment of this section, the date that is 180 days after the date of enactment of this section. (2)Continued effect of final agency actionA final agency action remanded under paragraph (1) shall remain in effect while the Federal agency corrects any errors or deficiencies found by the court. (c)Limitations on claims (1)In generalNotwithstanding any other provision of law (except as provided in subparagraph (A) with respect to a shorter deadline), a claim described in subsection (a) shall be barred unless— (A)such claim is filed not later than 150 days after the final agency action is made public, unless a shorter deadline is specified under law; (B)in the case of a final agency action for which there was a public comment period on an environmental document, such claim— (i)is filed by a party that submitted a substantive and unique comment during such public comment period by the noticed comment deadline for the environmental document and such comment was sufficiently detailed to put the applicable Federal agency on notice of the issue upon which the party seeks review; and (ii)concerns the same subject matter raised in the comment submitted during the public comment period; (C)such claim is filed by a party that has suffered or imminently will suffer direct harm from the final agency action; and (D)such claim does not challenge the establishment of a categorical exclusion. (2)Supplemental environmental documentsIf an agency issues a supplemental environmental document in response to a court order remanding a final agency action, the deadline described in paragraph (1)(A) shall be the date on which the agency makes public the agency action for which the supplemental environmental document is prepared. A claim for review of such final agency action shall be limited to information contained in the final supplemental environmental document that was not contained in a previous environmental document for the final agency action. (3)Actions for use of tribal trust resourcesFor any final agency action that authorizes or affects the use of lands, minerals, or other resources already held in trust at the time of the final agency action by the United States for the benefit of a federally recognized Indian Tribe— (A)except as provided in subparagraph (B), there shall be no administrative or judicial review of such final agency action based on a claim of failure to comply with the requirements of this Act; and (B)subparagraph (A) shall not apply to actions for administrative or judicial review— (i)brought by the federally recognized Indian Tribe for which the United States holds the lands, minerals, or other resources in trust; or (ii)that involve reasonably foreseeable effects of the final agency action that occur outside the lands, minerals, or other resources held in trust by the United States for the benefit of a federally recognized Indian Tribe. (d)Deadline for resolution (1)In generalA court shall issue a final judgment on a claim described in subsection (a)— (A)as expeditiously as practicable; and (B)unless a shorter deadline is specified under Federal law, not later than the date that is 180 days after the date on which the agency record for the review is filed with the reviewing court, which shall not be more than 60 days after the filing of the claim. (2)Accelerated deadlinesNothing in this subsection may be construed to prevent a court from further expediting review of a claim described in subsection (a). (3)Appeals (A)FilingA notice of appeal of a final judgment described in this subsection shall be filed not later than 60 days after such final judgment is issued. In the case of a final agency action remanded under subsection (b), the agency and, if applicable, the applicant, shall have the right to appeal during the pendency of the remand. (B)Deadline for reviewA court shall issue a final decision on an appeal filed under subparagraph (A)— (i)as expeditiously as practicable; and (ii)not later than the date that is 180 days after the date on which the appeal is filed. (e)No effect on review of compliance with other deadlinesThis section shall not affect the right to obtain review under section 107(g)(3)..

4.Preservation of ongoing administrative correctionsThis Act, and the amendments made by this Act, shall not apply to any agency action with respect to which a Federal agency has, during the period beginning on January 20, 2025, and ending on the date of enactment of this Act— (1)filed a motion to voluntarily remand; or (2)otherwise reopened, reconsidered, or initiated corrective action under the statutory authority of the Federal agency, regardless of whether the Federal agency has completed such corrective action as of the date of enactment of this Act. Passed the House of Representatives December 18, 2025.Kevin F. McCumber,Clerk.

Introduced in House (IH)

119 HR 4776 IH: Standardizing Permitting and Expediting Economic Development Act U.S. House of Representatives 2025-07-25 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. I119th CONGRESS1st SessionH. R. 4776IN THE HOUSE OF REPRESENTATIVESJuly 25, 2025Mr. Westerman (for himself and Mr. Golden of Maine) introduced the following bill; which was referred to the Committee on Natural ResourcesA BILLTo amend the National Environmental Policy Act of 1969 to clarify ambiguous provisions and facilitate a more efficient, effective, and timely environmental review process.

1.Short titleThis Act may be cited as the Standardizing Permitting and Expediting Economic Development Act or the SPEED Act.

2.NEPA reform (a)PurposeSection 2 of the National Environmental Policy Act of 1969 (42 U.S.C. 4321) is amended— (1)by striking The purposes and inserting the following: (a)The purposes; and (2)by adding at the end the following: (b)This Act is a purely procedural statute intended to ensure Federal agencies consider the environmental impacts of their actions during the decisionmaking process. This Act does not mandate particular results, and only prescribes a process. Nothing in this Act shall be construed to mandate any specific environmental outcome or result, nor shall this Act be interpreted to confer substantive rights or impose substantive duties beyond procedural requirements. . (b)Procedure for determination of level of reviewSection 106 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336) is amended— (1)in the heading, by inserting ; scope of review after level of review; (2)in subsection (a)— (A)in paragraph (3), by striking or; (B)in paragraph (4), by striking action. and inserting action;; and (C)by adding at the end the following: (5)the proposed agency action is an action for which such agency’s compliance with another statute’s requirements serve a similar function as the requirements of this Act with respect to such action; or (6)the proposed agency action— (A)relates to a project or action that has already been reviewed pursuant to a State or Tribal environmental review statute; and (B)the lead agency determines such review meets the requirements of this Act. ; (3)in subsection (b)— (A)in paragraph (2), by striking does not and inserting is not likely to; and (B)in paragraph (3), by amending subparagraph (B) to read as follows: (B)is not required to— (i)undertake new scientific or technical research unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable; or (ii)undertake new scientific and technical research after the receipt of an application, as applicable, with respect to such proposed agency action.; and (4)by adding at the end the following: (c)Scope of reviewIn developing an environmental document for a proposed agency action, a Federal agency— (1)may only consider effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and (2)may not consider effects that are speculative, attenuated from the project or action, separate in time or place from the project or action, or in relation to separate existing or potential future projects or actions. (d)CertaintyA Federal agency may not rescind, withdraw, amend, alter, or otherwise render ineffective any environmental document completed under this Act unless the Federal agency has been so ordered by a court. . (c) Timely and unified Federal reviews Section 107 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a) is amended— (1) in subsection (a)(3), by adding at the end Such comments shall be limited to matters relating to the proposed agency action with respect to which such cooperating agency has jurisdiction by law. If a lead agency determines an environmental document is not required to be prepared with respect to a proposed agency action under section 106(a), another agency may not prepare an environmental document with respect to such proposed agency action.; (2) in subsection (b)— (A) by striking To the extent practicable, and inserting the following: (1) Document To the extent practicable, ; and (B) by adding at the end the following: (2) Consideration timing (A) In general In developing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the sooner of, as applicable— (i) the date of receipt of an application with respect to such proposed agency action; and (ii) the date of publication of a notice of intent or decision to prepare such environmental document for such proposed agency action. (B) Applicability to other law This paragraph does not affect any review of information required under subchapter II of chapter 5 of title 5, United States Code, with respect to comments received during the public comment period as applicable. (C) Unnecessary delay A Federal agency may not delay the issuance of an environmental document or a final agency action, including any decision or determination, on the basis of awaiting new scientific or technical research or information that was not available as of the deadlines specified in subparagraph (A). ; (3) in subsection (d), by striking action. and inserting action. Where applicable, the statement of purpose and need shall meet the goals of the applicant.; and (4) in subsection (g)— (A) in paragraph (2), by striking , in consultation with the applicant, to and inserting if the applicant approves such extension. If the applicant approves such extension, the lead agency shall; (B) in paragraph (3)(A), by striking A project sponsor may and inserting Except as provided in subparagraph (C), a project sponsor may; and (C) by adding at the end the following: (C) Exception A project sponsor that approved an extension of a deadline under paragraph (2) may not obtain review of a failure to act in accordance with such deadline under subparagraph (A) unless the lead agency fails to meet the new deadline or is delaying for reasons other than those necessary to complete its review. . (d)Programmatic environmental documentsSection 108 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336b) is amended— (1)in paragraph (1), by striking 5 and inserting 10; and (2)in paragraph (2), by striking 5 and inserting 10. (e)Adoption of categorical exclusionsSection 109 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336c) is amended— (1)in the text preceding paragraph (1), by inserting , or that was legislatively enacted by Congress, after procedures; and (2)in paragraph (2), by inserting , if applicable, after established the categorical exclusion. (f)DefinitionsSection 111 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336e) is amended— (1)in paragraph (1), by inserting , or Congress deems by statute, after Federal agency has determined; (2)in paragraph (10)— (A)in subparagraph (B)— (i)in clause (iii)— (I)by inserting , grants after loan guarantees; (II)by striking sufficient and inserting complete; and (III)by striking subsequent use of such financial assistance or the; (ii)by redesignating clauses (iv) through (vii) as clauses (vi) through (ix), respectively; and (iii)by inserting after clause (iii) the following: (iv)farm ownership loans and operating loan guarantees by the Farm Service Agency pursuant to sections 305 and 311 through 319 of the Consolidated Farm and Rural Development Act; (v)the issuance of a permit or other authorization by an agency where the proposal under consideration is otherwise being evaluated or was previously evaluated by the lead agency in compliance with this Act; ; and (B)by adding at the end the following: (C)Additional exclusionsAn agency action may not be determined to be a major Federal action solely on the basis of the provision of Federal funds, including a grant, loan, loan guarantee, and funding assistance.; and (3)by adding at the end the following: (14)Reasonably foreseeableThe term reasonably foreseeable, with respect to environmental effects of a proposed agency action— (A)means effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and (B)does not include effects that are— (i)speculative; (ii)attenuated from the proposed agency action; (iii)separate in time or place from the proposed agency action; or (iv)in relation to separate existing or potential future projects.. (g)DutiesSection 204 of the National Environmental Policy Act of 1969 (42 U.S.C. 4344) is amended in paragraph (4) by inserting energy, after health,.

3.Judicial reviewTitle I of the National Environmental Policy Act of 1969 (42 U.S.C. 4331 et seq.) is amended by adding at the end the following:

113.Judicial review (a)Standard of reviewNotwithstanding chapter 7 of title 5, United States Code, in reviewing a claim of whether a final agency action complies with the procedural requirements of this Act, a court may only hold that the final agency action does not comply with the procedural requirements of this Act if the court determines— (1)the agency abused its substantial discretion in complying with the procedural requirements of this Act; and (2)the agency would have reached a different result with respect to the final agency action absent such abuse of substantial discretion. (b)Role of the courtA court reviewing a claim described in subsection (a) may not substitute its judgment for that of the agency regarding the environmental effects of a proposed agency action. (c)Remand (1)In generalIf a court holds that a final agency action does not comply with the procedural requirements of this Act, the court may only remand the final agency action to the agency with— (A)specific instruction to correct the errors or deficiencies in compliance; and (B)a reasonable schedule and deadline, which such deadline may not exceed— (i)with regard to an order entered on or after the date of enactment of this section, the date that is 180 days after the date on which the order was entered; and (ii)with regard to an order entered before the date of enactment of this section, the date that is 180 days after the date of enactment of this section. (2)Continued effect of final agency actionA final agency action remanded under paragraph (1) shall remain in effect while the Federal agency corrects any errors or deficiencies specified by the court. (d)Limitations on claims (1)In generalNotwithstanding chapter 7 of title 5, United States Code, a claim described in subsection (a) shall be barred unless— (A)such claim is filed not later than 150 days after the final agency action is made public, unless a shorter timeline is specified under Federal law; (B)in the case of a final agency action for which there was a public comment period on an environmental document, such claim— (i)is filed by a party that submitted a substantive and unique comment during such public comment period by the noticed comment deadline for the environmental document and such comment was sufficiently detailed to put the applicable Federal agency on notice of the issue upon which the party seeks review and shows that the party would suffer direct harm if its comments were not addressed; and (ii)concerns the same subject matter raised in the comment submitted during the public comment period; and (C)such claim does not challenge the establishment of a categorical exclusion. (2)Supplemental environmental documentsIf an agency issues a supplemental environmental document in response to a court order remanding a final agency action, the deadline described in paragraph (1)(A) shall be the date on which the agency makes public the agency action for which the supplemental environmental document is prepared. A claim for review of such final agency action shall be limited to information contained in the final supplemental environmental document that was not contained in a previous environmental document for the final agency action. (e)Deadline for resolution (1)In generalA court shall issue a final judgment on a claim described in subsection (a)— (A)as expeditiously as practicable; and (B)unless a shorter timeline is specified under Federal law, not later than the date that is 180 days after the date on which the agency record for the review is filed with the reviewing court, which shall not be more than 30 days from the filing of the claim. (2)Accelerated deadlinesNothing in this subsection may be construed to prevent a court form further expediting review of a claim described in subsection (a). (3)Appeals (A)FilingA notice of appeal of a final judgment described in this subsection shall be filed not later than 60 days after such final judgment is issued. (B)Deadline for reviewA court shall issue a final decision on an appeal filed under subparagraph (A)— (i)as expeditiously as practicable; and (ii)not later than the date that is 180 days after the date on which the appeal is filed. (f)Final agency actions (1)In generalThe completion of an environmental assessment, an environmental impact statement, or a finding of no significant impact, or a determination to categorically exclude an action, shall not be considered a final agency action under chapter 7 of title 5, United States Code. (2)Agency action definedIn this section, the term agency action has the meaning given such term in section 551 of title 5, United States Code. (g)No effect on review of compliance with other deadlinesThis section shall not affect the right to obtain review under section 107(g)(3). .

Referred in Senate (RFS)

119 HR 4776 : Standardizing Permitting and Expediting Economic Development Act U.S. House of Representatives 2025-12-18 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IIB119th CONGRESS1st SessionH. R. 4776IN THE SENATE OF THE UNITED STATESDecember 18, 2025Received; read twice and referred to the Committee on Environment and Public WorksAN ACTTo amend the National Environmental Policy Act of 1969 to clarify ambiguous provisions and facilitate a more efficient, effective, and timely environmental review process.1.Short titleThis Act may be cited as the Standardizing Permitting and Expediting Economic Development Act or the SPEED Act.2.NEPA reform(a)PurposeSection 2 of the National Environmental Policy Act of 1969 (42 U.S.C. 4321) is amended—(1)by striking The purposes and inserting (a) The purposes; and(2)by adding at the end the following:(b)This Act is a purely procedural statute intended to ensure Federal agencies consider the environmental impacts of their actions during the decisionmaking process. This Act does not mandate particular results, and only prescribes a process. Nothing in this Act shall be construed to mandate any specific environmental outcome or result, nor shall this Act be interpreted to confer substantive rights or impose substantive duties beyond procedural requirements..(b)Procedure for determination of level of reviewSection 106 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336) is amended—(1)in the heading, by inserting ; scope of review after level of review;(2)in subsection (a)—(A)in paragraph (3), by striking or;(B)in paragraph (4), by striking action. and inserting action;; and(C)by adding at the end the following:(5)the agency determines the proposed agency action is an action for which such agency’s compliance with another statute’s requirements serves the function of agency compliance with this Act with respect to such action; or(6)the proposed agency action relates to a project or action that has already been reviewed pursuant to a State environmental review statute or a Tribal environmental review statute, ordinance, resolution, regulation, or formally adopted policy and the lead agency determines such review serves the function of agency compliance with this Act.;(3)in subsection (b)—(A)in paragraph (2), by striking does not and inserting is not likely to; and(B)in paragraph (3), by amending subparagraph (B) to read as follows:(B)is not required to—(i)undertake new scientific or technical research unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable; or(ii)undertake new scientific or technical research after the receipt of an application, as applicable, with respect to a proposed agency action.; and(4)by adding at the end the following:(c)Scope of reviewIn preparing an environmental document for a proposed agency action, a Federal agency—(1)may consider only those effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and(2)may not consider effects that are speculative, attenuated from the project or action, separate in time or place from the project or action, or in relation to separate existing or potential future projects or actions.(d)Certainty(1)Environmental documentsA Federal agency may not rescind, withdraw, amend, alter, or otherwise render ineffective any environmental document completed under this Act for a project or action where there is an applicant unless the Federal agency has been so ordered by a court or the applicant has agreed in writing to such rescission, withdrawal, amendment, or alteration.(2)Authorizations(A)In generalExcept as provided in this subsection or existing law, a Federal agency may not revoke, rescind, withdraw, terminate, suspend, amend, alter, or take any other action to interfere with an authorization unless—(i)the Federal agency is required to take such action by order of a court of competent jurisdiction;(ii)the holder of the authorization has materially breached the terms of the authorization, or otherwise violated applicable law;(iii)the authorization was obtained through fraud, intentional concealment, or material misrepresentation;(iv)such action is necessary to prevent specific, immediate, substantial, and proximate harm or damage to life, property, national security, or defense that was not considered in the underlying environmental review process or final agency action for the authorization; or(v)the Federal agency has received a request from the holder of the authorization or project sponsor to take such action.(B)RequirementThe actions described in subparagraph (A) shall be, as appropriate and where feasible, supported by clear and convincing evidence and reasonably limited in duration and scope by the agency to address the specific issue such action is intended to address.(C)NoticeBefore an agency takes an action described in subparagraph (A), the agency shall notify the holder of the authorization and the project sponsor in writing of such action, including by providing a detailed explanation of the action, identifying the statutory authority relied upon for the action, and providing the evidence supporting the action.(D)Judicial review(i)In generalAn action described in subparagraph (A) shall be subject to judicial review under chapter 7 of title 5, United States Code.(ii)VenueA person seeking judicial review of an action described in subparagraph (A) may only obtain review of such action in the United States court of appeals for any circuit wherein the project for which the authorization was issued is located.(iii)Petitions by Federal agenciesNo Federal agency may petition a court for vacatur or voluntary remand of an authorization unless the holder of the authorization or the project sponsor consents in writing to such a petition.(E)Savings clauseNothing in subparagraph (A) shall be construed to provide any Federal agency new, enhanced, or expanded authority, or to limit any existing authority, concerning any authorization.(e)Presumption of negative impacts of taking no action relating to tribal trust resourcesFor any proposed agency action carried out on, or directly affecting, tribal trust resources (including lands and minerals) that is initiated by the federally recognized Indian Tribe for which the United States holds the affected resources in trust, and for which an environmental document was prepared that included consideration of a no action alternative, there shall be a presumption that the effects of taking no action will be negative for the federally recognized Indian Tribe.(f)Effect of threshold determinations on other agenciesIf a lead agency determines an environmental document is not required to be prepared with respect to a proposed agency action under subsection (a), another agency may not prepare an environmental document with respect to such proposed agency action..(c)Timely and unified Federal reviews(1)Lead AgencySection 107(a) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(a)) is amended—(A)in paragraph (2)—(i)in subparagraph (B), by striking at the earliest practicable time and inserting in accordance with subsection (g)(2);(ii)in subparagraph (D), by striking carry out the proposed agency action and inserting carry out the proposed agency action in compliance with the deadlines outlined in subsection (g); and(iii)in subparagraph (E)—(I)by striking a review and inserting an environmental review; and(II)by striking such review and inserting such environmental review; and(B)in paragraph (3)—(i)by inserting (including counties, boroughs, parishes, and other political subdivisions of a State) after local agency; and(ii)by adding at the end Such comments from Federal cooperating agencies shall be limited to matters relating to the proposed agency action with respect to which such Federal cooperating agency has jurisdiction by law..(2)One documentSection 107(b) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(b)) is amended—(A)by striking To the extent practicable, and inserting the following:(1)DocumentTo the extent practicable,; and(B)by adding at the end the following:(2)Consideration timing(A)In generalIn preparing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the earlier of, as applicable—(i)the date of receipt of an application with respect to such proposed agency action; and(ii)the date of publication of a notice of intent or decision to prepare such environmental document for such proposed agency action.(B)Applicability to other lawThis paragraph does not affect any review of information required under subchapter II of chapter 5 of title 5, United States Code, with respect to comments received during the public comment period as applicable.(C)DelayA Federal agency may not delay the issuance of an environmental document or a final agency action, including any decision or determination, on the basis of awaiting new scientific or technical research or information that was not available as of the earlier of the dates described in subparagraph (A)..(3)Statement of Purpose and NeedSection 107(d) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(d)) is amended by striking action. and inserting action. Where applicable, the statement of purpose and need shall meet the goals of the applicant..(4)DeadlinesSection 107(g) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(g)) is amended—(A)by redesignating paragraphs (1), (2), and (3) as paragraphs (3), (5), and (6), respectively;(B)by inserting before paragraph (3) (as so redesignated) the following:(1)Applications for authorizations(A)Notification of complete or incomplete applicationUnless a shorter deadline is specified by law, in connection with a proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 60 days after the date on which the applicant submits the application to the agency, the agency shall document the receipt of the application and—(i)notify the applicant that the application is complete; or(ii)notify the applicant that the application is incomplete and request in writing any additional information that the agency needs to determine that the application is complete and begin preparation of an environmental document.(B)Agency determination(i)Complete determinationIf an agency determines an application is complete under subparagraph (A)(i), the agency shall, not later than 60 days after the date on which the agency makes such determination—(I)notify the applicant that the agency has determined that the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, is not a major Federal action, or that no further agency action is required;(II)issue a notice of intent to prepare an environmental impact statement for such proposed agency action; or(III)notify the applicant that the agency has determined that preparation of an environmental assessment is necessary.(ii)Incomplete determinationIf the agency requests additional information under subparagraph (A)(ii), the deadline described in clause (i) shall be based on the date on which the agency receives the additional information instead of the date on which the determination is made.(2)Cooperating agencies(A)In generalNot later than 21 days after a lead agency issues a notice of intent under paragraph (1)(B)(i)(II) or notifies an applicant under paragraph (1)(B)(i)(III) with respect to a proposed agency action, the lead agency shall—(i)identify all agencies that are likely to have environmental review, authorization, or other responsibilities with respect to the proposed agency action; and(ii)invite each such agency to become a cooperating agency.(B)Deadline to accept invitationNot later than 21 days after an agency receives an invitation to become a cooperating agency under subparagraph (A)(ii), such agency shall accept or deny the invitation.(C)Convening of cooperating agenciesNot later than 7 days after the deadline described in subparagraph (B) has passed for each agency that received an invitation to become a cooperating agency under subparagraph (A)(ii), the lead agency that sent each such invitation shall convene each agency that accepts such an invitation to coordinate on developing the schedule under subsection (a)(2)(D) for the applicable proposed agency action.(D)Unidentified agenciesIn the event that an agency that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposed agency action is not identified under subparagraph (A)(i), the lead agency with respect to the proposed agency action shall—(i)invite such unidentified agency to become a cooperating agency by not later than 7 days after becoming aware that the agency has jurisdiction by law or special expertise; and(ii)if such agency accepts the invitation, incorporate such agency into the schedule developed under subsection (a)(2)(D) and update such schedule accordingly by not later than 14 days after the date on which such agency accepts the invitation.;(C)in paragraph (3) (as so redesignated)—(i)by striking In general and inserting Review timeline; and(ii)by striking (2) and inserting (5);(D)by inserting after paragraph (3) (as so redesignated) the following:(4)Deadline for final agency actionFor any proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 30 days after completing an environmental impact statement or an environmental assessment for the proposed agency action, the lead agency, and any cooperating agency, shall issue a final agency action. The agency issuing such final agency action shall include in the final agency action a performance schedule for the completion of any other outstanding authorizations.;(E)in paragraph (5) (as so redesignated)—(i)by striking the deadline described in paragraph (1) and inserting a deadline described in this subsection; and(ii)by striking , in consultation with the applicant, to and inserting if the applicant approves such extension. If the applicant approves such extension, the lead agency shall;(F)in paragraph (6) (as so redesignated)—(i)by striking A project sponsor may and inserting Except as provided in subparagraph (C), a project sponsor may; and(ii)by adding at the end the following:(C)ExceptionA project sponsor that approved an extension of a deadline under paragraph (5) may not obtain judicial review of a failure to act in accordance with such deadline under subparagraph (A) unless the lead agency fails to meet the new deadline or is delaying for reasons other than those necessary to complete its review.; and(G)by adding at the end the following:(7)Concurrent reviewIn carrying out an environmental review, the lead agency and each cooperating agency shall carry out the obligations of that agency under other applicable laws concurrently, and in conjunction, with other required reviews for the proposed agency action, pursuant to the requirements of applicable law, including, if applicable, under this Act..(d)Programmatic environmental documentsSection 108 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336b) is amended—(1)by striking When an agency prepares and inserting the following:(a)Programmatic environmental documentsWhen an agency prepares;(2)in paragraph (1), by striking 5 and inserting 10;(3)in paragraph (2), by striking 5 and inserting 10; and(4)by adding at the end the following:(b)Reliance on previously completed environmental reviews(1)Actions that are substantially the sameA lead agency may satisfy the requirements of this Act with respect to a major Federal action by relying on an environmental assessment, environmental impact statement, or a categorical exclusion determination that the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency completed for another major Federal action if the lead agency determines that—(A)the new major Federal action is substantially the same as the other major Federal action or, if applicable, an alternative analyzed in such environmental assessment or environmental impact statement; and(B)if applicable, the effects of the new major Federal action are substantially the same as the effects analyzed in such environmental assessment or environmental impact statement.(2)Actions that are not substantially the sameIf a new major Federal action is not substantially the same as another major Federal action or an alternative analyzed in an environmental assessment or environmental impact statement completed by the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency, the lead agency may modify or augment any such previously completed environmental assessment or environmental impact statement as necessary to satisfy the requirements of this Act with respect to the new major Federal action. The lead agency shall make such modified environmental assessment or environmental impact statement publicly available as a new environmental assessment or environmental impact statement..(e)Adoption of categorical exclusionsSection 109 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336c) is amended in the text preceding paragraph (1), by inserting , or that was legislatively enacted by Congress, after procedures.(f)DefinitionsSection 111 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336e) is amended—(1)by redesignating paragraphs (1) through (13) as paragraphs (2) through (14), respectively;(2)by inserting before paragraph (2) (as so redesignated) the following:(1)AuthorizationThe term authorization means any lease, right-of-way, easement, license, permit, approval, finding, determination, or other administrative decision issued by an agency or any interagency consultation that is required or authorized under Federal law in order to construct, modify, or operate a project.;(3)in paragraph (2) (as so redesignated), by inserting , or Congress deems by statute, after Federal agency has determined;(4)in paragraph (11) (as so redesignated)—(A)in subparagraph (B)—(i)in clause (iii)—(I)by inserting grants (including capitalization grants), cost share awards, after loan guarantees,;(II)by striking sufficient and inserting complete; and(III)by striking subsequent use of such financial assistance or the;(ii)by redesignating clauses (iv) through (vii) as clauses (vi) through (ix), respectively; and(iii)by inserting after clause (iii) the following:(iv)farm ownership loans and operating loan guarantees by the Farm Service Agency pursuant to sections 305 and 311 through 319 of the Consolidated Farm and Rural Development Act;(v)the issuance of an authorization by an agency where the effects of the action or project being permitted or authorized were previously evaluated by another agency in compliance with this Act;; and(B)by adding at the end the following:(C)Additional exclusionsAn agency action may not be determined to be a major Federal action solely on the basis of the provision of Federal funds, including a grant, loan, loan guarantee, and funding assistance.; and(5)by adding at the end the following:(15)Reasonably foreseeableThe term reasonably foreseeable, with respect to environmental effects of a proposed agency action—(A)means effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and(B)does not include effects that are—(i)speculative;(ii)attenuated from the proposed agency action;(iii)separate in time or place from the proposed agency action; or(iv)in relation to separate existing or potential future projects..(g)DutiesSection 204 of the National Environmental Policy Act of 1969 (42 U.S.C. 4344) is amended in paragraph (4) by inserting energy, after health,.3.Judicial reviewTitle I of the National Environmental Policy Act of 1969 (42 U.S.C. 4331 et seq.) is amended—(1)by redesignating section 112 as section 110A and moving such section so as to appear after section 110; and(2)by inserting before section 111 the following:110B.Judicial review(a)Role of the courtIn reviewing a claim of whether a final agency action complies with the requirements of this Act, a court—(1)shall afford substantial deference to the agency; and(2)may not substitute its judgment for that of the agency regarding the environmental effects included in the final agency action or included in the environmental document.(b)Remand(1)In generalIf a court holds, under section 706(2)(A) of title 5, United States Code, that a final agency action does not comply with the requirements of this Act, the only remedy the court may order, notwithstanding chapter 7 of title 5, United States Code, is to remand, without vacatur or injunction, the final agency action to the agency with—(A)specific instruction to correct the errors or deficiencies found by the court; and(B)a reasonable schedule and deadline to correct such errors or deficiencies, which such deadline may not exceed—(i)with regard to an order entered on or after the date of enactment of this section, the date that is 180 days after the date on which the order was entered; and(ii)with regard to an order entered before the date of enactment of this section, the date that is 180 days after the date of enactment of this section.(2)Continued effect of final agency actionA final agency action remanded under paragraph (1) shall remain in effect while the Federal agency corrects any errors or deficiencies found by the court.(c)Limitations on claims(1)In generalNotwithstanding any other provision of law (except as provided in subparagraph (A) with respect to a shorter deadline), a claim described in subsection (a) shall be barred unless—(A)such claim is filed not later than 150 days after the final agency action is made public, unless a shorter deadline is specified under law;(B)in the case of a final agency action for which there was a public comment period on an environmental document, such claim—(i)is filed by a party that submitted a substantive and unique comment during such public comment period by the noticed comment deadline for the environmental document and such comment was sufficiently detailed to put the applicable Federal agency on notice of the issue upon which the party seeks review; and(ii)concerns the same subject matter raised in the comment submitted during the public comment period; (C)such claim is filed by a party that has suffered or imminently will suffer direct harm from the final agency action; and(D)such claim does not challenge the establishment of a categorical exclusion.(2)Supplemental environmental documentsIf an agency issues a supplemental environmental document in response to a court order remanding a final agency action, the deadline described in paragraph (1)(A) shall be the date on which the agency makes public the agency action for which the supplemental environmental document is prepared. A claim for review of such final agency action shall be limited to information contained in the final supplemental environmental document that was not contained in a previous environmental document for the final agency action.(3)Actions for use of tribal trust resourcesFor any final agency action that authorizes or affects the use of lands, minerals, or other resources already held in trust at the time of the final agency action by the United States for the benefit of a federally recognized Indian Tribe—(A)except as provided in subparagraph (B), there shall be no administrative or judicial review of such final agency action based on a claim of failure to comply with the requirements of this Act; and(B)subparagraph (A) shall not apply to actions for administrative or judicial review—(i)brought by the federally recognized Indian Tribe for which the United States holds the lands, minerals, or other resources in trust; or(ii)that involve reasonably foreseeable effects of the final agency action that occur outside the lands, minerals, or other resources held in trust by the United States for the benefit of a federally recognized Indian Tribe.(d)Deadline for resolution(1)In generalA court shall issue a final judgment on a claim described in subsection (a)—(A)as expeditiously as practicable; and(B)unless a shorter deadline is specified under Federal law, not later than the date that is 180 days after the date on which the agency record for the review is filed with the reviewing court, which shall not be more than 60 days after the filing of the claim.(2)Accelerated deadlinesNothing in this subsection may be construed to prevent a court from further expediting review of a claim described in subsection (a).(3)Appeals(A)FilingA notice of appeal of a final judgment described in this subsection shall be filed not later than 60 days after such final judgment is issued. In the case of a final agency action remanded under subsection (b), the agency and, if applicable, the applicant, shall have the right to appeal during the pendency of the remand. (B)Deadline for reviewA court shall issue a final decision on an appeal filed under subparagraph (A)—(i)as expeditiously as practicable; and(ii)not later than the date that is 180 days after the date on which the appeal is filed.(e)No effect on review of compliance with other deadlinesThis section shall not affect the right to obtain review under section 107(g)(3)..4.Preservation of ongoing administrative correctionsThis Act, and the amendments made by this Act, shall not apply to any agency action with respect to which a Federal agency has, during the period beginning on January 20, 2025, and ending on the date of enactment of this Act—(1)filed a motion to voluntarily remand; or(2)otherwise reopened, reconsidered, or initiated corrective action under the statutory authority of the Federal agency, regardless of whether the Federal agency has completed such corrective action as of the date of enactment of this Act.Passed the House of Representatives December 18, 2025.Kevin F. McCumber,Clerk.

Reported in House (RH)

119 HR 4776 RH: Standardizing Permitting and Expediting Economic Development Act U.S. House of Representatives 2025-12-04 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. IBUnion Calendar No. 344119th CONGRESS1st SessionH. R. 4776[Report No. 119–395]IN THE HOUSE OF REPRESENTATIVESJuly 25, 2025Mr. Westerman (for himself and Mr. Golden of Maine) introduced the following bill; which was referred to the Committee on Natural ResourcesDecember 4, 2025Additional sponsors: Mr. Cuellar, Mr. Stauber, Mr. Vicente Gonzalez of Texas, Ms. Hageman, Mr. Baumgartner, Mr. Evans of Colorado, Ms. Perez, Mr. Davis of North Carolina, Mrs. Miller-Meeks, Mr. Gray, Mr. Begich, Mr. Costa, and Mrs. Kiggans of VirginiaDecember 4, 2025Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printedStrike out all after the enacting clause and insert the part printed in italicFor text of introduced bill, see copy of bill as introduced on July 25, 2025A BILLTo amend the National Environmental Policy Act of 1969 to clarify ambiguous provisions and facilitate a more efficient, effective, and timely environmental review process.1.Short titleThis Act may be cited as the Standardizing Permitting and Expediting Economic Development Act or the SPEED Act.2.NEPA reform(a)PurposeSection 2 of the National Environmental Policy Act of 1969 (42 U.S.C. 4321) is amended—(1)by striking The purposes and inserting (a) The purposes; and(2)by adding at the end the following:(b)This Act is a purely procedural statute intended to ensure Federal agencies consider the environmental impacts of their actions during the decisionmaking process. This Act does not mandate particular results, and only prescribes a process. Nothing in this Act shall be construed to mandate any specific environmental outcome or result, nor shall this Act be interpreted to confer substantive rights or impose substantive duties beyond procedural requirements..(b)Procedure for determination of level of reviewSection 106 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336) is amended—(1)in the heading, by inserting ; scope of review after level of review;(2)in subsection (a)—(A)in paragraph (3), by striking or;(B)in paragraph (4), by striking action. and inserting action;; and(C)by adding at the end the following:(5)the agency determines the proposed agency action is an action for which such agency’s compliance with another statute’s requirements serves the function of agency compliance with this Act with respect to such action; or(6)the proposed agency action relates to a project or action that has already been reviewed pursuant to a State environmental review statute or a Tribal environmental review statute, ordinance, resolution, regulation, or formally adopted policy and the lead agency determines such review serves the function of agency compliance with this Act.;(3)in subsection (b)—(A)in paragraph (2), by striking does not and inserting is not likely to; and(B)in paragraph (3), by amending subparagraph (B) to read as follows:(B)is not required to—(i)undertake new scientific or technical research unless the new scientific or technical research is essential to a reasoned choice among alternatives, and the overall costs and time frame of obtaining it are not unreasonable; or(ii)undertake new scientific or technical research after the receipt of an application, as applicable, with respect to a proposed agency action.; and(4)by adding at the end the following:(c)Scope of reviewIn preparing an environmental document for a proposed agency action, a Federal agency—(1)may consider only those effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and(2)may not consider effects that are speculative, attenuated from the project or action, separate in time or place from the project or action, or in relation to separate existing or potential future projects or actions.(d)Certainty(1)Environmental documentsA Federal agency may not rescind, withdraw, amend, alter, or otherwise render ineffective any environmental document completed under this Act for a project or action where there is an applicant unless the Federal agency has been so ordered by a court or the applicant has agreed in writing to such rescission, withdrawal, amendment, or alteration.(2)Authorizations(A)In generalExcept as provided in this subsection or existing law, a Federal agency may not revoke, rescind, withdraw, terminate, suspend, amend, alter, or take any other action to interfere with an authorization unless—(i)the Federal agency is required to take such action by order of a court of competent jurisdiction;(ii)the holder of the authorization has materially breached the terms of the authorization, or otherwise violated applicable law;(iii)the authorization was obtained through fraud, intentional concealment, or material misrepresentation;(iv)such action is necessary to prevent specific, immediate, substantial, and proximate harm or damage to life, property, national security, or defense that was not considered in the underlying environmental review process or final agency action for the authorization; or(v)the Federal agency has received a request from the holder of the authorization or project sponsor to take such action.(B)RequirementThe actions described in subparagraph (A) shall be, as appropriate and where feasible, supported by clear and convincing evidence and reasonably limited in duration and scope by the agency to address the specific issue such action is intended to address.(C)NoticeBefore an agency takes an action described in subparagraph (A), the agency shall notify the holder of the authorization and the project sponsor in writing of such action, including by providing a detailed explanation of the action, identifying the statutory authority relied upon for the action, and providing the evidence supporting the action.(D)Judicial review(i)In generalAn action described in subparagraph (A) shall be subject to judicial review under chapter 7 of title 5, United States Code.(ii)VenueA person seeking judicial review of an action described in subparagraph (A) may only obtain review of such action in the United States court of appeals for any circuit wherein the project for which the authorization was issued is located.(iii)Petitions by Federal agenciesNo Federal agency may petition a court for vacatur or voluntary remand of an authorization unless the holder of the authorization or the project sponsor consents in writing to such a petition.(E)Savings clauseNothing in subparagraph (A) shall be construed to provide any Federal agency new, enhanced, or expanded authority, or to limit any existing authority, concerning any authorization.(e)Presumption of negative impacts of taking no action relating to tribal trust resourcesFor any proposed agency action carried out on, or directly affecting, tribal trust resources (including lands and minerals) that is initiated by the federally recognized Indian Tribe for which the United States holds the affected resources in trust, and for which an environmental document was prepared that included consideration of a no action alternative, there shall be a presumption that the effects of taking no action will be negative for the federally recognized Indian Tribe.(f)Effect of threshold determinations on other agenciesIf a lead agency determines an environmental document is not required to be prepared with respect to a proposed agency action under subsection (a), another agency may not prepare an environmental document with respect to such proposed agency action..(c)Timely and unified Federal reviews(1)Lead AgencySection 107(a) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(a)) is amended—(A)in paragraph (2)—(i)in subparagraph (B), by striking at the earliest practicable time and inserting in accordance with subsection (g)(2);(ii)in subparagraph (D), by striking carry out the proposed agency action and inserting carry out the proposed agency action in compliance with the deadlines outlined in subsection (g); and(iii)in subparagraph (E)—(I)by striking a review and inserting an environmental review; and(II)by striking such review and inserting such environmental review; and(B)in paragraph (3)—(i)by inserting (including counties, boroughs, parishes, and other political subdivisions of a State) after local agency; and(ii)by adding at the end Such comments from Federal cooperating agencies shall be limited to matters relating to the proposed agency action with respect to which such Federal cooperating agency has jurisdiction by law..(2)One documentSection 107(b) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(b)) is amended—(A)by striking To the extent practicable, and inserting the following:(1)DocumentTo the extent practicable,; and(B)by adding at the end the following:(2)Consideration timing(A)In generalIn preparing an environmental document for a proposed agency action, no Federal agency shall be required to consider any scientific or technical research that becomes publicly available after the earlier of, as applicable—(i)the date of receipt of an application with respect to such proposed agency action; and(ii)the date of publication of a notice of intent or decision to prepare such environmental document for such proposed agency action.(B)Applicability to other lawThis paragraph does not affect any review of information required under subchapter II of chapter 5 of title 5, United States Code, with respect to comments received during the public comment period as applicable.(C)DelayA Federal agency may not delay the issuance of an environmental document or a final agency action, including any decision or determination, on the basis of awaiting new scientific or technical research or information that was not available as of the earlier of the dates described in subparagraph (A)..(3)Statement of Purpose and NeedSection 107(d) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(d)) is amended by striking action. and inserting action. Where applicable, the statement of purpose and need shall meet the goals of the applicant..(4)DeadlinesSection 107(g) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(g)) is amended—(A)by redesignating paragraphs (1), (2), and (3) as paragraphs (3), (5), and (6), respectively;(B)by inserting before paragraph (3) (as so redesignated) the following:(1)Applications for authorizations(A)Notification of complete or incomplete applicationUnless a shorter deadline is specified by law, in connection with a proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 60 days after the date on which the applicant submits the application to the agency, the agency shall document the receipt of the application and—(i)notify the applicant that the application is complete; or(ii)notify the applicant that the application is incomplete and request in writing any additional information that the agency needs to determine that the application is complete and begin preparation of an environmental document.(B)Agency determination(i)Complete determinationIf an agency determines an application is complete under subparagraph (A)(i), the agency shall, not later than 60 days after the date on which the agency makes such determination—(I)notify the applicant that the agency has determined that the proposed agency action is excluded pursuant to one of the agency’s categorical exclusions, is not a major Federal action, or that no further agency action is required;(II)issue a notice of intent to prepare an environmental impact statement for such proposed agency action; or(III)notify the applicant that the agency has determined that preparation of an environmental assessment is necessary.(ii)Incomplete determinationIf the agency requests additional information under subparagraph (A)(ii), the deadline described in clause (i) shall be based on the date on which the agency receives the additional information instead of the date on which the determination is made.(2)Cooperating agencies(A)In generalNot later than 21 days after a lead agency issues a notice of intent under paragraph (1)(B)(i)(II) or notifies an applicant under paragraph (1)(B)(i)(III) with respect to a proposed agency action, the lead agency shall—(i)identify all agencies that are likely to have environmental review, authorization, or other responsibilities with respect to the proposed agency action; and(ii)invite each such agency to become a cooperating agency.(B)Deadline to accept invitationNot later than 21 days after an agency receives an invitation to become a cooperating agency under subparagraph (A)(ii), such agency shall accept or deny the invitation.(C)Convening of cooperating agenciesNot later than 7 days after the deadline described in subparagraph (B) has passed for each agency that received an invitation to become a cooperating agency under subparagraph (A)(ii), the lead agency that sent each such invitation shall convene each agency that accepts such an invitation to coordinate on developing the schedule under subsection (a)(2)(D) for the applicable proposed agency action.(D)Unidentified agenciesIn the event that an agency that has jurisdiction by law or special expertise with respect to any environmental impact involved in a proposed agency action is not identified under subparagraph (A)(i), the lead agency with respect to the proposed agency action shall—(i)invite such unidentified agency to become a cooperating agency by not later than 7 days after becoming aware that the agency has jurisdiction by law or special expertise; and(ii)if such agency accepts the invitation, incorporate such agency into the schedule developed under subsection (a)(2)(D) and update such schedule accordingly by not later than 14 days after the date on which such agency accepts the invitation.;(C)in paragraph (3) (as so redesignated)—(i)by striking In general and inserting Review timeline; and(ii)by striking (2) and inserting (5);(D)by inserting after paragraph (3) (as so redesignated) the following:(4)Deadline for final agency actionFor any proposed agency action for which an applicant submitted an application for an authorization to an agency, not later than 30 days after completing an environmental impact statement or an environmental assessment for the proposed agency action, the lead agency, and any cooperating agency, shall issue a final agency action. The agency issuing such final agency action shall include in the final agency action a performance schedule for the completion of any other outstanding authorizations.;(E)in paragraph (5) (as so redesignated)—(i)by striking the deadline described in paragraph (1) and inserting a deadline described in this subsection; and(ii)by striking , in consultation with the applicant, to and inserting if the applicant approves such extension. If the applicant approves such extension, the lead agency shall;(F)in paragraph (6) (as so redesignated)—(i)by striking A project sponsor may and inserting Except as provided in subparagraph (C), a project sponsor may; and(ii)by adding at the end the following:(C)ExceptionA project sponsor that approved an extension of a deadline under paragraph (5) may not obtain judicial review of a failure to act in accordance with such deadline under subparagraph (A) unless the lead agency fails to meet the new deadline or is delaying for reasons other than those necessary to complete its review.; and(G)by adding at the end the following:(7)Concurrent reviewIn carrying out an environmental review, the lead agency and each cooperating agency shall carry out the obligations of that agency under other applicable laws concurrently, and in conjunction, with other required reviews for the proposed agency action, pursuant to the requirements of applicable law, including, if applicable, under this Act..(d)Programmatic environmental documentsSection 108 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336b) is amended—(1)by striking When an agency prepares and inserting the following:(a)Programmatic environmental documentsWhen an agency prepares;(2)in paragraph (1), by striking 5 and inserting 10;(3)in paragraph (2), by striking 5 and inserting 10; and(4)by adding at the end the following:(b)Reliance on previously completed environmental reviews(1)Actions that are substantially the sameA lead agency may satisfy the requirements of this Act with respect to a major Federal action by relying on an environmental assessment, environmental impact statement, or a categorical exclusion determination that the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency completed for another major Federal action if the lead agency determines that—(A)the new major Federal action is substantially the same as the other major Federal action or, if applicable, an alternative analyzed in such environmental assessment or environmental impact statement; and(B)if applicable, the effects of the new major Federal action are substantially the same as the effects analyzed in such environmental assessment or environmental impact statement.(2)Actions that are not substantially the sameIf a new major Federal action is not substantially the same as another major Federal action or an alternative analyzed in an environmental assessment or environmental impact statement completed by the lead agency, another Federal agency, or a project sponsor under the supervision of a Federal agency, the lead agency may modify or augment any such previously completed environmental assessment or environmental impact statement as necessary to satisfy the requirements of this Act with respect to the new major Federal action. The lead agency shall make such modified environmental assessment or environmental impact statement publicly available as a new environmental assessment or environmental impact statement..(e)Adoption of categorical exclusionsSection 109 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336c) is amended in the text preceding paragraph (1), by inserting , or that was legislatively enacted by Congress, after procedures.(f)DefinitionsSection 111 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336e) is amended—(1)by redesignating paragraphs (1) through (13) as paragraphs (2) through (14), respectively;(2)by inserting before paragraph (2) (as so redesignated) the following:(1)AuthorizationThe term authorization means any lease, right-of-way, easement, license, permit, approval, finding, determination, or other administrative decision issued by an agency or any interagency consultation that is required or authorized under Federal law in order to construct, modify, or operate a project.;(3)in paragraph (2) (as so redesignated), by inserting , or Congress deems by statute, after Federal agency has determined;(4)in paragraph (11) (as so redesignated)—(A)in subparagraph (B)—(i)in clause (iii)—(I)by inserting grants (including capitalization grants), cost share awards, after loan guarantees,;(II)by striking sufficient and inserting complete; and(III)by striking subsequent use of such financial assistance or the;(ii)by redesignating clauses (iv) through (vii) as clauses (vi) through (ix), respectively; and(iii)by inserting after clause (iii) the following:(iv)farm ownership loans and operating loan guarantees by the Farm Service Agency pursuant to sections 305 and 311 through 319 of the Consolidated Farm and Rural Development Act;(v)the issuance of an authorization by an agency where the effects of the action or project being permitted or authorized were previously evaluated by another agency in compliance with this Act;; and(B)by adding at the end the following:(C)Additional exclusionsAn agency action may not be determined to be a major Federal action solely on the basis of the provision of Federal funds, including a grant, loan, loan guarantee, and funding assistance.; and(5)by adding at the end the following:(15)Reasonably foreseeableThe term reasonably foreseeable, with respect to environmental effects of a proposed agency action—(A)means effects that share a reasonably close causal relationship to, and are proximately caused by, the immediate project or action under consideration; and(B)does not include effects that are—(i)speculative;(ii)attenuated from the proposed agency action;(iii)separate in time or place from the proposed agency action; or(iv)in relation to separate existing or potential future projects..(g)DutiesSection 204 of the National Environmental Policy Act of 1969 (42 U.S.C. 4344) is amended in paragraph (4) by inserting energy, after health,.3.Judicial reviewTitle I of the National Environmental Policy Act of 1969 (42 U.S.C. 4331 et seq.) is amended—(1)by redesignating section 112 as section 110A and moving such section so as to appear after section 110; and(2)by inserting before section 111 the following:110B.Judicial review(a)Role of the courtIn reviewing a claim of whether a final agency action complies with the requirements of this Act, a court—(1)shall afford substantial deference to the agency; and(2)may not substitute its judgment for that of the agency regarding the environmental effects included in the final agency action or included in the environmental document.(b)Remand(1)In generalIf a court holds, under section 706(2)(A) of title 5, United States Code, that a final agency action does not comply with the requirements of this Act, the only remedy the court may order, notwithstanding chapter 7 of title 5, United States Code, is to remand, without vacatur or injunction, the final agency action to the agency with—(A)specific instruction to correct the errors or deficiencies found by the court; and(B)a reasonable schedule and deadline to correct such errors or deficiencies, which such deadline may not exceed—(i)with regard to an order entered on or after the date of enactment of this section, the date that is 180 days after the date on which the order was entered; and(ii)with regard to an order entered before the date of enactment of this section, the date that is 180 days after the date of enactment of this section.(2)Continued effect of final agency actionA final agency action remanded under paragraph (1) shall remain in effect while the Federal agency corrects any errors or deficiencies found by the court.(c)Limitations on claims(1)In generalNotwithstanding any other provision of law (except as provided in subparagraph (A) with respect to a shorter deadline), a claim described in subsection (a) shall be barred unless—(A)such claim is filed not later than 150 days after the final agency action is made public, unless a shorter deadline is specified under law;(B)in the case of a final agency action for which there was a public comment period on an environmental document, such claim—(i)is filed by a party that submitted a substantive and unique comment during such public comment period by the noticed comment deadline for the environmental document and such comment was sufficiently detailed to put the applicable Federal agency on notice of the issue upon which the party seeks review; and(ii)concerns the same subject matter raised in the comment submitted during the public comment period; (C)such claim is filed by a party that has suffered or imminently will suffer direct harm from the final agency action; and(D)such claim does not challenge the establishment of a categorical exclusion.(2)Supplemental environmental documentsIf an agency issues a supplemental environmental document in response to a court order remanding a final agency action, the deadline described in paragraph (1)(A) shall be the date on which the agency makes public the agency action for which the supplemental environmental document is prepared. A claim for review of such final agency action shall be limited to information contained in the final supplemental environmental document that was not contained in a previous environmental document for the final agency action.(3)Actions for use of tribal trust resourcesFor any final agency action that authorizes or affects the use of lands, minerals, or other resources already held in trust at the time of the final agency action by the United States for the benefit of a federally recognized Indian Tribe—(A)except as provided in subparagraph (B), there shall be no administrative or judicial review of such final agency action based on a claim of failure to comply with the requirements of this Act; and(B)subparagraph (A) shall not apply to actions for administrative or judicial review—(i)brought by the federally recognized Indian Tribe for which the United States holds the lands, minerals, or other resources in trust; or(ii)that involve reasonably foreseeable effects of the final agency action that occur outside the lands, minerals, or other resources held in trust by the United States for the benefit of a federally recognized Indian Tribe.(d)Deadline for resolution(1)In generalA court shall issue a final judgment on a claim described in subsection (a)—(A)as expeditiously as practicable; and(B)unless a shorter deadline is specified under Federal law, not later than the date that is 180 days after the date on which the agency record for the review is filed with the reviewing court, which shall not be more than 60 days after the filing of the claim.(2)Accelerated deadlinesNothing in this subsection may be construed to prevent a court from further expediting review of a claim described in subsection (a).(3)Appeals(A)FilingA notice of appeal of a final judgment described in this subsection shall be filed not later than 60 days after such final judgment is issued. In the case of a final agency action remanded under subsection (b), the agency and, if applicable, the applicant, shall have the right to appeal during the pendency of the remand. (B)Deadline for reviewA court shall issue a final decision on an appeal filed under subparagraph (A)—(i)as expeditiously as practicable; and(ii)not later than the date that is 180 days after the date on which the appeal is filed.(e)No effect on review of compliance with other deadlinesThis section shall not affect the right to obtain review under section 107(g)(3)..December 4, 2025Reported with an amendment, committed to the Committee of the Whole House on the State of the Union, and ordered to be printed

The bill's own words, from our database (synced from the GPO BILLS XML); paragraph breaks added at the bill's section boundaries, nothing else changed.

All Actions (38)

DateChamberAll Actions
07/25/2025Library of CongressIntroduced in House
07/25/2025Library of CongressIntroduced in House
07/25/2025House floor actionsReferred to the House Committee on Natural Resources.
09/10/2025House committee actionsCommittee Hearings Held
11/20/2025House committee actionsCommittee Consideration and Mark-up Session Held
11/20/2025House committee actionsOrdered to be Reported in the Nature of a Substitute (Amended) by the Yeas and Nays: 25 - 18.
12/04/2025Library of CongressReported (Amended) by the Committee on Natural Resources. H. Rept. 119-395.
12/04/2025House floor actionsReported (Amended) by the Committee on Natural Resources. H. Rept. 119-395.
12/04/2025House floor actionsPlaced on the Union Calendar, Calendar No. 344.
12/15/2025Library of CongressSupplemental report filed by the Committee on Natural Resources, H. Rept. 119-395, Part II.
12/15/2025House floor actionsSupplemental report filed by the Committee on Natural Resources, H. Rept. 119-395, Part II.
12/16/2025House floor actionsRules Committee Resolution H. Res. 951 Reported to House. Rule provides for consideration of H.R. 4776, H.R. 1366, H.R. 845, H.R. 3616, H.R. 3632 and H.R. 4371. The resolution provides for consideration of H.R. 4776, under a structured rule and H.R. 1366, H.R. 845, H.R. 3616, H.R. 3632, and H.R. 4371 under a closed rule. The resolution provides one motion to recommit on each bill.
12/18/2025House floor actionsConsidered under the provisions of rule H. Res. 951. (consideration: CR H6029-6044)
12/18/2025House floor actionsRule provides for consideration of H.R. 4776, H.R. 1366, H.R. 845, H.R. 3616, H.R. 3632 and H.R. 4371. The resolution provides for consideration of H.R. 4776, under a structured rule and H.R. 1366, H.R. 845, H.R. 3616, H.R. 3632, and H.R. 4371 under a closed rule. The resolution provides one motion to recommit on each bill.
12/18/2025House floor actionsThe Speaker designated the Honorable Carol D. Miller to act as Chairwoman of the Committee.
12/18/2025House floor actionsHouse resolved itself into the Committee of the Whole House on the state of the Union pursuant to H. Res. 951 and Rule XVIII.
12/18/2025House floor actionsGENERAL DEBATE - The Committee of the Whole proceeded with one hour of general debate on H.R. 4776.
12/18/2025House floor actionsGENERAL DEBATE - The Committee of the Whole resumed general debate on H.R. 4776.
12/18/2025House floor actionsDEBATE - Pursuant to the provisions of H. Res. 951, the Committee of the Whole proceeded with 10 minutes of debate on the Clyde amendment No. 1.
12/18/2025House floor actionsPOSTPONED PROCEEDINGS - At the conclusion of debate on the Clyde amendment No. 1, the Chair put the question on agreeing to the amendment and by voice vote, announced the ayes had prevailed. Mr. Huffman demanded a recorded vote and the Chair postponed further proceedings until a time to be announced.
12/18/2025House floor actionsDEBATE - Pursuant to the provisions of H. Res. 951, the Committee of the Whole proceeded with 10 minutes of debate on the Roy amendment No. 5.
12/18/2025House floor actionsPOSTPONED PROCEEDINGS - At the conclusion of debate on the Roy amendment No. 5, the Chair put the question on agreeing to the amendment and by voice vote, announced the ayes had prevailed. Mr. Huffman demanded a recorded vote and the Chair postponed further proceedings until a time to be announced.
12/18/2025House floor actionsDEBATE - Pursuant to the provisions of H. Res. 951, the Committee of the Whole proceeded with 10 minutes of debate on the Roy amendment No. 6.
12/18/2025House floor actionsPOSTPONED PROCEEDINGS - At the conclusion of debate on the Roy amendment No. 6, the Chair put the question on agreeing to the amendment and by voice vote, announced the ayes had prevailed. Mr. Huffman demanded a recorded vote and the Chair postponed further proceedings until a time to be announced.
12/18/2025House floor actionsMr. Westerman moved that the committee rise.
12/18/2025House floor actionsOn motion that the committee rise Agreed to by voice vote.
12/18/2025House floor actionsCommittee of the Whole House on the state of the Union rises leaving H.R. 4776 as unfinished business.
12/18/2025House floor actionsConsidered as unfinished business. (consideration: CR H6065-6069)
12/18/2025House floor actionsThe House resolved into Committee of the Whole House on the state of the Union for further consideration.
12/18/2025House floor actionsThe House rose from the Committee of the Whole House on the state of the Union to report H.R. 4776.
12/18/2025House floor actionsThe previous question was ordered pursuant to the rule.
12/18/2025House floor actionsMs. Lee (NV) moved to recommit to the Committee on Natural Resources. (text: CR H6068)
12/18/2025House floor actionsThe previous question on the motion to recommit was ordered pursuant to clause 2(b) of rule XIX.
12/18/2025House floor actionsOn motion to recommit Failed by the Yeas and Nays: 206 - 211 (Roll no. 355).
12/18/2025Library of CongressPassed/agreed to in House: On passage Passed by the Yeas and Nays: 221 - 196 (Roll no. 356).
12/18/2025House floor actionsOn passage Passed by the Yeas and Nays: 221 - 196 (Roll no. 356). (text of amendment in the nature of a substitute: CR H6037-6040)
12/18/2025House floor actionsMotion to reconsider laid on the table Agreed to without objection.
12/18/2025SenateReceived in the Senate and Read twice and referred to the Committee on Environment and Public Works.

Titles (11)

Title TypeTitle
Short Titles from RFS (Referred to Senate) bill textStandardizing Permitting and Expediting Economic Development Act
Short Titles from RFS (Referred to Senate) bill textSPEED Act
Short Title(s) as Passed HouseSPEED Act
Short Title(s) as Passed HouseStandardizing Permitting and Expediting Economic Development Act
Official Titles from EH (Engrossed in House) bill textTo amend the National Environmental Policy Act of 1969 to clarify ambiguous provisions and facilitate a more efficient, effective, and timely environmental review process.
Short Title(s) as Reported to HouseSPEED Act
Short Title(s) as Reported to HouseStandardizing Permitting and Expediting Economic Development Act
Display TitleSPEED Act
Short Title(s) as IntroducedStandardizing Permitting and Expediting Economic Development Act
Short Title(s) as IntroducedSPEED Act
Official Title as IntroducedTo amend the National Environmental Policy Act of 1969 to clarify ambiguous provisions and facilitate a more efficient, effective, and timely environmental review process.

Amendments (4)

AmendmentSponsorPurposeLatest Action
HAMDT 138Rep. Clyde, Andrew S. [R-GA-9]Amendment sought to clarify that direct harm does not include emotional, aesthetic, or recreational harm unaccompanied by a material physical or property harm.12/18/2025 On agreeing to the Clyde amendment (A001) Failed by recorded vote: 205 - 220 (Roll no. 352).
HAMDT 139Rep. Roy, Chip [R-TX-21]Amendment sought to clarify that the National Environmental Policy Act reviews only apply to environmental impacts that the lead agency or cooperating federal agencies have the legal authority to regulate.12/18/2025 On agreeing to the Roy amendment (A002) Failed by recorded vote: 208 - 214 (Roll no. 353).
HAMDT 140Rep. Roy, Chip [R-TX-21]Amendment sought to define further what significant effects will trigger an Environmental Impact Statement.12/18/2025 On agreeing to the Roy amendment (A003) Failed by recorded vote: 204 - 217 (Roll no. 354).
HAMDT 14312/18/2025 On agreeing to the Rules amendment (A004) Agreed to without objection.

Cosponsors (14)

* = Original cosponsor

Committees (8)

CommitteeActivity
Senate - Environment and Public Works Committee12/18/2025 Referred To
House - Natural Resources Committee12/18/2025 Unknown
House - Natural Resources Committee12/18/2025 Unknown
House - Natural Resources Committee12/15/2025 Reported By
House - Natural Resources Committee12/04/2025 Reported By
House - Natural Resources Committee11/20/2025 Markup By
House - Natural Resources Committee09/10/2025 Hearings By (full committee)
House - Natural Resources Committee07/25/2025 Referred To

Related Bills (2)

Subjects (3)

Policy Area: Environmental Protection

All data on this page comes from our own database (legislation.congress_* tables), synced daily from the GPO govinfo BILLSTATUS and BILLS collections. Formatted after congress.gov; nothing is generated. Member placement is their DW-NOMINATE score (voteview.com, Lewis et al.) - a measurement of roll-call voting behavior, not our judgement. Buckets: Left below −0.50 · Lean Left to −0.25 · Center to +0.25 · Lean Right to +0.50 · Right above +0.50. The bill's Support meter aggregates the people who signed the bill - sponsor and current cosponsors, each counted once - nothing else.