Only the right has signed this so far (Bill Ranking)
S. 1020 · 119th Congress (2025-2026)
8 members · Left 0 · Center 2 · Right 6 (Bill Ranking)
| Sponsor | Sen. Daines, Steve (R-MT) (Introduced 03/13/2025) |
|---|---|
| Sponsor Voting Record | Right · DW-NOMINATE +0.59 · measured from every roll-call vote this member has cast (voteview.com) (Sponsor Ranking) |
| Support |
LLLCLRR support across the spectrum: 8 members signed on (Bill Ranking) this bill: sponsor + current cosponsors, each once |
| Committees | Senate - Energy and Natural Resources Committee; Senate - Energy and Natural Resources Committee |
| Latest Action | 05/11/2026 Became Public Law No: 119-90. |
| Roll Call Votes | 1 |
| Source | view on congress.gov → |
Public Law: Public Law 119-90
Public Law (05/11/2026)
This act authorizes the Federal Energy Regulatory Commission (FERC) to extend construction deadlines for hydropower projects that were issued a license before March 13, 2020. FERC is authorized, upon the request of the licensees, to extend the deadline for beginning construction on such projects an additional six years beyond the eight-year extension FERC is authorized to provide under current law. The extension must consist of no more than three consecutive two-year periods.
The act also provides that FERC may reinstate certain expired licenses for projects with construction deadlines extended under this act, effective as of the date they expire.
S1020 ENR: To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects. U.S. Senate text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. One Hundred Nineteenth Congress of the United States of America 2d Session Begun and held at the City of Washington on Saturday, the third day of January, two thousand and twenty six S. 1020
IN THE SENATE OF THE UNITED STATES AN ACT To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects. 1. Extension of time to commence construction of certain hydropower projects (a) Definition of covered project In this section, the term covered project means a hydropower project with respect to which the Federal Energy Regulatory Commission issued a license before March 13, 2020. (b) Authorization of extension Notwithstanding section 13 of the Federal Power Act (16 U.S.C. 806), on the request of a licensee of a covered project, the Federal Energy Regulatory Commission may, after reasonable notice and for good cause shown, extend in accordance with subsection (c) the period during which the licensee is required to commence construction of the covered project for not more than an additional 6 years beyond the 8 years authorized by that section. (c) Period of extension An extension of time to commence construction of a covered project under subsection (b) shall— (1) consist of not more than 3 consecutive 2-year periods; (2) begin on the date on which the final extension of the period for commencement of construction granted to the licensee under section 13 of the Federal Power Act (16 U.S.C. 806) expires; and (3) end on the date that is not more than 6 years after the latest date to which the Federal Energy Regulatory Commission is authorized to extend the period for commencement of construction under that section. (d) Reinstatement of Expired License If the time period required under section 13 of the Federal Power Act (16 U.S.C. 806) to commence construction of a covered project expires after December 31, 2023, and before the date of enactment of this Act— (1) the Federal Energy Regulatory Commission may reinstate the license for the applicable project effective as of the date of expiration of the license; and (2) the extension authorized under subsection (b) shall take effect on the date of that expiration. Speaker of the House of Representatives Vice President of the United States and President of the Senate
119 S1020 ES: To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects. U.S. Senate text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. 119th CONGRESS1st SessionS. 1020IN THE SENATE OF THE UNITED STATESAN ACTTo require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects.1.Extension of time to commence construction of certain hydropower projects(a)Definition of covered projectIn this section, the term covered project means a hydropower project with respect to which the Federal Energy Regulatory Commission issued a license before March 13, 2020.(b)Authorization of extensionNotwithstanding section 13 of the Federal Power Act (16 U.S.C. 806), on the request of a licensee of a covered project, the Federal Energy Regulatory Commission may, after reasonable notice and for good cause shown, extend in accordance with subsection (c) the period during which the licensee is required to commence construction of the covered project for not more than an additional 6 years beyond the 8 years authorized by that section.(c)Period of extensionAn extension of time to commence construction of a covered project under subsection (b) shall—(1)consist of not more than 3 consecutive 2-year periods;(2)begin on the date on which the final extension of the period for commencement of construction granted to the licensee under section 13 of the Federal Power Act (16 U.S.C. 806) expires; and(3)end on the date that is not more than 6 years after the latest date to which the Federal Energy Regulatory Commission is authorized to extend the period for commencement of construction under that section. (d)Reinstatement of Expired LicenseIf the time period required under section 13 of the Federal Power Act (16 U.S.C. 806) to commence construction of a covered project expires after December 31, 2023, and before the date of enactment of this Act—(1)the Federal Energy Regulatory Commission may reinstate the license for the applicable project effective as of the date of expiration of the license; and(2)the extension authorized under subsection (b) shall take effect on the date of that expiration. Passed the Senate July 29, 2025.Secretary
119 S1020 IS: To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects. U.S. Senate 2025-03-13 text/xml EN Pursuant to Title 17 Section 105 of the United States Code, this file is not subject to copyright protection and is in the public domain. II119th CONGRESS1st SessionS. 1020IN THE SENATE OF THE UNITED STATESMarch 13, 2025Mr. Daines (for himself, Mr. Fetterman, Mr. Cassidy, Mr. Kennedy, Ms. Murkowski, and Mr. Sheehy) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural ResourcesA BILLTo require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects.1.Extension of time to commence construction of certain hydropower projects(a)Definition of covered projectIn this section, the term covered project means a hydropower project with respect to which the Federal Energy Regulatory Commission issued a license before March 13, 2020.(b)Authorization of extensionNotwithstanding section 13 of the Federal Power Act (16 U.S.C. 806), on the request of a licensee of a covered project, the Federal Energy Regulatory Commission may, after reasonable notice and for good cause shown, extend in accordance with subsection (c) the period during which the licensee is required to commence construction of the covered project for not more than an additional 6 years beyond the 8 years authorized by that section.(c)Period of extensionAn extension of time to commence construction of a covered project under subsection (b) shall—(1)consist of not more than 3 consecutive 2-year periods;(2)begin on the date on which the final extension of the period for commencement of construction granted to the licensee under section 13 of the Federal Power Act (16 U.S.C. 806) expires; and(3)end on the date that is not more than 6 years after the latest date to which the Federal Energy Regulatory Commission is authorized to extend the period for commencement of construction under that section. (d)Reinstatement of Expired LicenseIf the time period required under section 13 of the Federal Power Act (16 U.S.C. 806) to commence construction of a covered project expires after December 31, 2023, and before the date of enactment of this Act—(1)the Federal Energy Regulatory Commission may reinstate the license for the applicable project effective as of the date of expiration of the license; and(2)the extension authorized under subsection (b) shall take effect on the date of that expiration.
The bill's own words, from our database (synced from the GPO BILLS XML); paragraph breaks added at the bill's section boundaries, nothing else changed.
| Date | Chamber | All Actions |
|---|---|---|
| 03/13/2025 | Library of Congress | Introduced in Senate |
| 03/13/2025 | Senate | Read twice and referred to the Committee on Energy and Natural Resources. |
| 07/29/2025 | Library of Congress | Senate Committee on Energy and Natural Resources discharged by Unanimous Consent. |
| 07/29/2025 | Senate | Senate Committee on Energy and Natural Resources discharged by Unanimous Consent. |
| 07/29/2025 | Library of Congress | Passed/agreed to in Senate: Passed Senate without amendment by Unanimous Consent. (consideration: CR S4797-4798; text: CR S4797-4798) |
| 07/29/2025 | Senate | Passed Senate without amendment by Unanimous Consent. (consideration: CR S4797-4798; text: CR S4797-4798) |
| 08/01/2025 | Senate | Message on Senate action sent to the House. |
| 08/01/2025 | House floor actions | Received in the House. |
| 08/01/2025 | House floor actions | Held at the desk. |
| 04/21/2026 | House floor actions | Mrs. Harshbarger moved to suspend the rules and pass the bill. |
| 04/21/2026 | House floor actions | Considered under suspension of the rules. (consideration: CR H3024-3025) |
| 04/21/2026 | House floor actions | DEBATE - The House proceeded with forty minutes of debate on S. 1020. |
| 04/21/2026 | House floor actions | At the conclusion of debate, the Yeas and Nays were demanded and ordered. Pursuant to the provisions of clause 8, rule XX, the Chair announced that further proceedings on the motion would be postponed. |
| 04/21/2026 | House floor actions | Considered as unfinished business. (consideration: CR H3026-3027) |
| 04/21/2026 | Library of Congress | Passed/agreed to in House: On motion to suspend the rules and pass the bill Agreed to by the Yeas and Nays: (2/3 required): 394 - 14 (Roll no. 129). (text: CR H3024) |
| 04/21/2026 | House floor actions | On motion to suspend the rules and pass the bill Agreed to by the Yeas and Nays: (2/3 required): 394 - 14 (Roll no. 129). (text: CR H3024) |
| 04/21/2026 | House floor actions | Motion to reconsider laid on the table Agreed to without objection. |
| 04/30/2026 | Library of Congress | Presented to President. |
| 04/30/2026 | House floor actions | Presented to President. |
| 05/11/2026 | Library of Congress | Signed by President. |
| 05/11/2026 | Library of Congress | Signed by President. |
| 05/11/2026 | Library of Congress | Became Public Law No: 119-90. |
| 05/11/2026 | Library of Congress | Became Public Law No: 119-90. |
| Title Type | Title |
|---|---|
| Display Title | A bill to require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects. |
| Official Title as Introduced | A bill to require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects. |
There are no amendments to this bill.
* = Original cosponsor
| Committee | Activity |
|---|---|
| Senate - Energy and Natural Resources Committee | 07/29/2025 Discharged From |
| Senate - Energy and Natural Resources Committee | 03/13/2025 Referred To |
Policy Area: Energy
All data on this page comes from our own database (legislation.congress_* tables), synced daily from the GPO govinfo BILLSTATUS and BILLS collections. Formatted after congress.gov; nothing is generated. Member placement is their DW-NOMINATE score (voteview.com, Lewis et al.) - a measurement of roll-call voting behavior, not our judgement. Buckets: Left below −0.50 · Lean Left to −0.25 · Center to +0.25 · Lean Right to +0.50 · Right above +0.50. The bill's Support meter aggregates the people who signed the bill - sponsor and current cosponsors, each counted once - nothing else.